Search KfW-Tenders

Aural/Navigation

Service

Follow us:     
More about our partners: More about our partners:

KfW-Tenders

Entries: 56
  1-10   |
  • Apr 20, 2018

    Consulting, Environmental and Social Impact Study for Faecal Sludge Treatment Plant

    Deadline: May 22, 2018

    Ref: 2010 65 754Requested services:Undertake an environmental and social impact study für a project to construct a faecal sludge treatment plant in Abomey-CalaviNote: Download document in French language!

    • Trade
    • Benin
    • kostenpflichtig
  • Apr 20, 2018

    Construction Services, Sewage Treatment Plant/Treated Water Pipeline

    Deadline: Jun 07, 2018

    Projet de Réalisation de la Station d'Epuration de Mok Nine Industrielle y compris le transfert des Eaux Epurées Ref.-No.: P03/2018Requested Services:- construction of the industrial sewage treatment plant Moknine, 5,000 m³/d, BOD5 = 2,000 kg/O2/d;- supply and construction of HDPE-pipeline for the evacuation of treated water, l = 4,700 m, DN = 1,000 mPlease note: download document only in French!

    • Trade
    • Tunisia
    • kostenpflichtig
  • Apr 20, 2018

    Construction Services, Evacuation of Treated Sewage from Treatment Plant Aousja

    Deadline: Jun 05, 2018

    Travaux d'Eloignement du Rejet des Eaux Usées Epurées de la STEP d'Aousja dans le Gouvernorat de BizerteRef.-No.: 14/2018Requested services:- construction of a buffer basin (7,500 m³) for the sewage treatment plant Aousja;- supply and laying of HDPE pipes, 6,000 m, DN 100 - 630 mm, PN 6;- supply and laying of prestressed concrete pipes, 350 m, DN 1.000 mm;- Construction and equipment of 2 pumping stations, 320 l/s, pumping height 12 or 14 mPlease note: download document only in French!

    • Trade
    • Tunisia
    • kostenpflichtig
  • Apr 19, 2018

    Consulting, Climate Change Adaptation in the Central District of Honduras - DEADLINE EXTENSION

    Deadline: May 11, 2018

    Program "Adaptation to climate change in urban areas in Central America – Component Honduras"Ref. No.: BMZ 2014 67745 Program:In the framework of the Program "Adaptation to climate change in urban areas in Central America – Component Honduras" of the German Official Financial Cooperation with the Republic of Honduras, the German Development Bank (KfW Entwicklungsbank) will finance investments in adapting to climate change in the Central District of Honduras.The goal of the Program is to mitigate the risk of the population in precarious areas of the metropolitan area of the Central District of Honduras in the face of floods and landslides.Program measures:The measures envisaged in the Program include:a.   Investments in structural and non-structural measures to mitigate the risk of floods and landslides;b.   Strengthening of governance for risk management and climate change;c.   Institutional strengthening of the AMDC for the identification and reduction of risks, as well as the implementation of the measures of the Program and;d.   Consultancy services to support AMDC in the implementation and monitoring of the Program.  Consulting services requested:a.   Support for the AMDC in planning, organization, implementation, monitoring, evaluation and systematization of the Program; b.   Support for the AMDC with the revision and approval of the proposed Operating Manual of the Program elaborated by AMDC, or failing that, the elaboration of the Manual; c.   Support for the AMDC with the revision and approval of the methodology for selection and prioritization of the structural investments and the proposal of specific technical measures that the AMDC has drawn up, or failing that, support to the AMDC in the prioritization of structural investments and in the definition of specific technical measures; d.   Support to the AMDC in the articulation with the institutions involved for the implementation of the measures to strengthen the governance for climate change and risk management;e.   Support to AMDC in the definition and implementation of institutional strengthening measures;f.    Support to the AMDC in the formulation, hiring, supervision and liquidation of the physical works according to the guidelines of KfW and in fulfillment of the environmental, health, work safety and social security norms.g.   Support to the AMDC in the specification, acquisition, adjudication, reception and distribution of goods and services to be financed;h.   Support to the AMDC in the design, implementation and follow up of the monitoring and evaluation system of the Program;i.    Support to the AMDC in the programming and control of the utilization of the funds of the German Official Financial Cooperation (projection of disbursements, verification of statements of accounts, revision of requests of reimbursements, authorization of payments, etc.);j.    Support to the AMDC in the optimization, streamlining and efficiency of the procedures of revisions and approvals of the processes and requests sent to KfW (communications, non-objection, reimbursements, etc.);k.   Support to the AMDC in the preparation of reports of physical and financial progress of the Program, like any other that is required from the consultant under the Program.

    • Trade
    • Honduras
    • kostenpflichtig
  • Apr 19, 2018

    Replacement/Reconstruction of high voltage substations

    Deadline: May 18, 2018

    Trans-Balkan Electricity Corridor (I) – Grid Section in Montenegro – Part II – LOT 1Tender No: 202 062 107-01Short description of the goods/ services tendered:The project called "The Action" is part of a larger project with the full title "Trans-Balkan Electricity Corridor (I) - Grid Section in Montenegro". Crnogorski Elektroprenosni Sistem - CGES (hereinafter the Employer) has secured a WBIF CF 1015 MNE ENE: Investment Grant MNE - SER - BIH Power Interconnector upgrade to 400 kV (WBIF Grant). The Employer will use a portion of the available funds for the payment of the works to be performed under Lot (1) of subject project. The Lot (1) consist of two components:Component 1: Replacement of High Voltage Equipment in several high voltage substations.Component 2: Reconstruction of Protection Relay and Bay Control devices/systems, auxiliary systems and local and remote SCADA integration of several high voltage substations

    • Trade
    • Montenegro
    • kostenpflichtig
  • Apr 18, 2018

    TVET College Furniture

    Deadline: Jul 17, 2018

    Higher Education and TVET Programme Phase 3Ref.-No.: MOE/TVET/KfW 2011 66 305/ICB-18/2018, BMZ-No. 2011 66 305Lot 1 - Supply and assistance with installation of furniture at TVET Colleges 

    • Trade
    • Ethiopia
    • kostenpflichtig
  • Apr 16, 2018

    Construction/Rehabilitation of Markets

    Deadline: Jun 05, 2018

    PROGRAMME D’APPUI A LA DECENTRALISATION (PAD) - COMPOSANTE 1 : CONSTRUCTIONS RÉHABILITATIONS DES INFRASTRUCTURES ÉCONOMIQUES PRIORITAIRESRef. No.: 001/PAD1-KfW/AGETUR-TOGO/2018, BMZ 2012 66 972, PN 30205Requested works:The Government of the Republic of Togo has obtained a grant of 5.000.000 EUR (3.279.785.000 FCFA) from the German Financial Cooperation (KfW). To support the ongoing process of urban development, infrastructure and public services (rehabilitation and construction of market places, 3 lots) corresponding to the needs of the users will be built up in three bigger Togolese Cities.Note: Download document only in French available!

    • Trade
    • Togo
    • kostenpflichtig
  • Apr 16, 2018

    Construction of water supply and basic sanitation project, City of Hargeisa

    Deadline: Jun 02, 2018

    Invitation for Tender No.: HWA/KfW/HWSBSP/CB01/2018Project ID: BMZ No. 32642 / 2015 68 336Hargeisa Water Agency invites sealed Bids from eligible Bidders for:- Construction of 4 Reservoirs of total storage capacity approx. 7,600.00 m3- 4 transmission mains (DCI Pipes of DN 100 - 500) with a total length of approx. 14 km with accessories)- 7 water distribution networks (PE pipes and associated fittings of total length approx. 150km, each fed by its own reservoir/elevated tanks. Butt welding required for the PE pipes).- Construction of Water Kiosks, Pumping Houses, chlorination units, connection chambers- Supply of Mechanical, Electrical and Hydraulic Equipment which includes but not limited to supply of chlorination units, bulk water meters, booster pumps, magnetic flap level meter, pressure switch etc. More details shall be given in the later stage of the bidding process.- Construction of Public Toilets and Septic Tanks in Town at selected areas- Construction of Sludge Treatment Plant on a plot size of approx. 150m x 200m

    • Trade
    • Somalia
    • kostenpflichtig
  • Apr 13, 2018

    Multi-Asset Class Discretionary Mandate

    Deadline: May 16, 2018

    PRONANPRef-N°: 2008.66.285 The project “National Program for Natural Protected Areas” aka PRONANP aims to strengthen biodiversity conservation. It has been implemented in Peru in eight regions of the country: Tumbes, Piura, Lambayeque, Amazonas, San Martín, Arequipa, Moquegua and Tacna. This project is co-financed by the Global Environment Facility, through the World Bank, and KfW from Germany; and implemented through an interinstitutional cooperation agreement between Profonanpe, the SERNANP and eight regional governments of the country.The main goal of this project is to contribute to the long term ecological sustainability of the protected areas of the country through the expansion of the ecological representation of the System of Protected Areas of the country and the implementation of conservation activities at different levels (national, regional and private) inside ecological corridors. It was deemed important to build a new support for conservation in the country to assure the viability and sustainability of the natural protected areas and articulate them with a broader territorial dynamic.The PRONANP project was endowed with USD 12.6 million (3/4 from KfW, 1/4 from the World Bank), with these assets legally owned as well as administered by Profonanpe according to the project goals specified in the separate agreement signed between KfW and PROFONANPE as well as in an operational manual. The profitability obtained from the PRONANP portfolio will contribute to the financial sustainability of the protected areas of the above mentioned ecological corridors.Key Features of the MandateProfonanpe is looking for one international financial institution to manage the bulk of the PRONANP assets, according to the strategic asset allocation and guidelines defined in its Investment Policy Statement (“IPS”).

    • Trade
    • Peru
    • kostenpflichtig
  • Apr 13, 2018

    Consulting Services, Energy Sector – Wind Farm

    Deadline: May 24, 2018

    Renewable Energy Project Kostolac - Wind FarmTender No.: BMZ-No. 2013 66 582, 2013 70 220Short description: Qualified independent consultants are invited to submit prequalification documents for consulting services for the implementation of the a.m. project. The project comprises the construction of a wind farm with an installed capacity of up to 66MW including grid connection (HV-Substation and HV-Transmission Line) and infrastructure measures e.g. construction of access roads. The Consultant shall provide expertise in concept preparation, tendering, engineering, design, project management and project execution services to the Employer to ensure the implementation of the project with respect to time, cost and quality. The Consultant will fulfill the role of a FIDIC Engineer (Yellow Book).

    • Trade
    • Serbia
    • kostenpflichtig
Entries: 56
  1-10   |

Search Filter

Target Market

Actions