KfW-Tenders

Entries: 56
  1-10   |
  • Apr 27, 2018

    Construction of a water supply system in the locality of „Cuatro Centrales – Litoral“ of the Municipality of Villa Tunari, Cochabamba

    Deadline: Jun 11, 2018

    Reference Number: 2007 65 628 (BMZ); FPS-03-00004085 (FPS)Short description of the project: Within the framework of financial cooperation between Germany and Bolivia, KfW co-finances a programme to improve water supply and sanitation services in rural towns (APPC), to which this project belongs. The main components of this gravity-fed water system are:- Water intake: 2,5 m-high gravity dam (plum concrete)- Water transmission: 6,3 Km in PVC and D.I. pipes, 200 mm in diameter.- Water distribution: 83,5 Km in PVC and HDPE pipe between 200 and 38 mm in diameter.- New water household connections: 1.467

    • Trade
    • Bolivia
    • kostenpflichtig
  • Apr 26, 2018

    Consulting Services, Hydroelectric/Wind/Solar Power Plants - EXTENSION OF DEADLINE

    Deadline: May 27, 2018

    Requested services:Preparation of prefeasibility studies (first stage) and feasibility studies (second stage) for small and medium hydroelectric plants (approximately 10-50 MW), wind and solar power plants in Bolivia, establishing a technical and financial classification. Up to three of the projects analyzed will be considered for financing under the Bolivian-German Financial Cooperation.

    • Trade
    • Bolivia
    • kostenpflichtig
  • Apr 24, 2018

    Equipment for Wastewater Treatment Plant

    Deadline: Jun 11, 2018

    Nanning Langdong Wastewater Treatment Plant Phase IV Project Ref. No. 0733-185305401701/01, KfW Ref. No. 2020 83 848Requested Services: Procurement of mechanical, electrical automation, laboratory equipment and related services

    • Trade
    • China
    • kostenpflichtig
  • Apr 24, 2018

    Buildings for Polytechnic College

    Deadline: Jun 08, 2018

    Technical and Vocational Education and Training Programme Phase 3Ref. No.: MOE/TVET/KfW 2011 66 305/ICB-13/2018,  BMZ-No. 2011 66 305Requested Works:Construction of Dormitory, Classroom and Workshops for Wukro Agricultural Polytechnic College

    • Trade
    • Ethiopia
    • kostenpflichtig
  • Apr 24, 2018

    Rehabilitation and Extension of Water Supply Facilities

    Deadline: Jun 11, 2018

    PRODIA Program (“Integrated Development Programme for Autarchies and surrounding rural zones”)Ref. No.: 03/UGEA/CMVC/VAS/2018, BMZ No. 2009 67471It is intended to prequalify construction firms for the execution of civil works, as summarized below:a) Rehabilitation works at existing raw water intake.b) Rehabilitation and Extension of existing Water Treatment Plant to a capacity of 3.000 m3/d, including the following components: flocculation tank, Clarifiers, gravity filters, chlorine plant.

    • Trade
    • Mozambique
    • kostenpflichtig
  • Apr 23, 2018

    Technical and Vocational Educational and Training Systems

    Deadline: May 23, 2018

    Technical and Vocational Education and Training Sector Support Project (TVET)Ref. No.: 52A000141- 02/KfW/PROAP-ETP/DINET/2018, BMZ Nº 2014 67 265The services comprise the following technical and vocational educational and training (TVET) systems:Lot 1 – Supply, install ation and after sale services of TVET Automotive Training SystemsLot 2 – Supply, installation and after sale services of TVET Training Systems in following areas:  Electrical, Mechanical and Civil EngineeringLot 3 – Supply, installation and after sale services of TVET Training Systems in the agriculture area

    • Trade
    • Mozambique
    • kostenpflichtig
  • Apr 23, 2018

    Replacement/Reconstruction of high voltage substations - DEADLINE EXTENSION

    Deadline: May 23, 2018

    Trans-Balkan Electricity Corridor (I) – Grid Section in Montenegro – Part II – LOT 1Tender No: 202 062 107-01Short description of the goods/ services tendered:The project called "The Action" is part of a larger project with the full title "Trans-Balkan Electricity Corridor (I) - Grid Section in Montenegro". Crnogorski Elektroprenosni Sistem - CGES (hereinafter the Employer) has secured a WBIF CF 1015 MNE ENE: Investment Grant MNE - SER - BIH Power Interconnector upgrade to 400 kV (WBIF Grant). The Employer will use a portion of the available funds for the payment of the works to be performed under Lot (1) of subject project. The Lot (1) consist of two components:Component 1: Replacement of High Voltage Equipment in several high voltage substations.Component 2: Reconstruction of Protection Relay and Bay Control devices/systems, auxiliary systems and local and remote SCADA integration of several high voltage substations

    • Trade
    • Montenegro
    • kostenpflichtig
  • Apr 23, 2018

    Design, Build and Operation of Wastewater Treatment Plants

    Deadline: May 28, 2018

    Open Programme Municipal Infrastructure IIRef. No.: KFW/BMZ 2009 66 671/GANJA_SHEKI/PH-III/C-1, BMZ 2008.6619.4Requested services:Lot 1 - WWTP Ganja: In stage 1 only mechanical treatment facilities shall be constructed for the design horizon in 2020 (ca. 350.000 PE).Lot 2 - WWTP Sheki: In stage 1 a mechanical and biological/sludge treatment plant shall be constructed for the design horizon in 2020 (ca. 39.500 PE).

    • Trade
    • Azerbaijan
    • kostenpflichtig
  • Apr 20, 2018

    Consulting, Environmental and Social Impact Study for Faecal Sludge Treatment Plant

    Deadline: May 22, 2018

    Ref: 2010 65 754Requested services:Undertake an environmental and social impact study für a project to construct a faecal sludge treatment plant in Abomey-CalaviNote: Download document in French language!

    • Trade
    • Benin
    • kostenpflichtig
  • Apr 20, 2018

    Construction Services, Sewage Treatment Plant/Treated Water Pipeline

    Deadline: Jun 07, 2018

    Projet de Réalisation de la Station d'Epuration de Mok Nine Industrielle y compris le transfert des Eaux Epurées Ref.-No.: P03/2018Requested Services:- construction of the industrial sewage treatment plant Moknine, 5,000 m³/d, BOD5 = 2,000 kg/O2/d;- supply and construction of HDPE-pipeline for the evacuation of treated water, l = 4,700 m, DN = 1,000 mPlease note: download document only in French!

    • Trade
    • Tunisia
    • kostenpflichtig
Entries: 56