Tender Notice Ukraine Environmental Technologies

Consulting Services, Municipal Water Infrastructure (Chernivtsi)

Tender Award

  • Country Ukraine
  • Financing KfW Entwicklungsbank
  • Reference Number BMZ201365899/KfW503954 (Phase 2) BMZ201565332/KfW503954 (Phase 3)
  • Subject Municipal Water Infrastructure Project Chernivtsi, Phase 2 and 3

Brief description of the Contract:

- Update of Feasibility Study for Phase 2 and Feasibility Study for Phase 3

- Separate TEOs (including all surveys and inspections required by the standing Ukrainian law) for Phase 2 and Phase 3 and their subsequent approval by the Ukrainian State Expertise

- Elaboration of a concept and a feasibility study on connection of the amalgamated communities around Chernivtsi to the water main. This project shall be treated as a separate one from the existing loan projects and shall be financed upon availability of the grant funds

- Optional Service – Detailed Design (including all surveys, inspections and ESMP) in full accordance with the standing Ukrainian law, preparation of Tender Documents (including Stage P and Stage R documents) Phase 2 and Phase 3 and

- Optional Service – Construction Supervision Phase 2 and Phase 3.


You must be logged in to access this page

Please click "Log in" to log in with your user details. If you do not have a GTAI user account yet, you can sign up free of charge in order to have access to all our services and information. Sign up now.

Log in

Please log in on this page with your log-in details.