Rehabilitation of a Water Treatment Plant
Deadline Extension
Deadline: May 02, 2024
Financing: KfW Entwicklungsbank
Requested services:
Rehabilitation of the water treatment plant El Hachef for the national water and electricity office ONEE
Your company is already operating in Germany and you would now like to export worldwide?
Deadline Extension
Deadline: May 02, 2024
Financing: KfW Entwicklungsbank
Requested services:
Rehabilitation of the water treatment plant El Hachef for the national water and electricity office ONEE
PQ-Result
Financing: KfW Entwicklungsbank
Project:
The project consists of the construction of several buildings on a plot of land along Boulevard Thomas Sankara (opposite the university) in Ouagadougou - Burkina Faso.
Requested Construction Services:
A 4-storey building (surface area 3,700 m²) with an auditorium,
A technical building (surface area 250 m²) bordering the street,
A road, a mineral car park and tree-lined areas to complete the facility.
The sustainable and climate-friendly design includes the use of sustainable local materials.
Deadline: May 22, 2024
Financing: KfW Entwicklungsbank
Requested Services:
Lot 5.1: The project is to extend the Guantang sewage treatment plant from the capacity of 40,000 m³/d to 80,000 m³/d. The scope of the works include construction of the civil work of the fine bar screen room and vortex grit chamber, improved carrousel oxidation ditch, secondary sedimentation tank, water distribution chamber and sludge discharge well and sludge pump house, emergency sludge thickening tank and other structures.
Deadline: May 20, 2024
Financing: KfW Entwicklungsbank/ Europäische Investitionsbank (EIB)
Requested Services:
construction of Birka force main DN1000 DI or HDPE 7.0 km long and the rehabilitation of approximately 1.2 km of surrounding sewer network
Expression of Interest - Prequalification
Deadline: May 08, 2024
Financing: KfW Entwicklungsbank
Project Measures:
Recently, two Feasibility Studies investigated the “biogas potential” of the existing Wastewater Treatment Plants (WWTP) across Jordan which mainly apply the extended aeration process. The studies recommended to upgrade the treatment processes of WWTPs South Amman and West Jerash to anaerobic sludge digestion and electricity generation by biogas. The current tender is focussing on WWTP West Jerash and related plants from “Cluster 1” (i.e. East Jerash and Kufranjah). Similar services...
Prequalification/ Deadline Extension
Deadline: May 09, 2024
Financing: KfW Entwicklungsbank/ Agence Française de Développement (AFD)
Requested Services:
Construction of multi modal integration works for 16 metro stations in corridor 1 - priority reach (10 stations), and underground (6 stations) namely Dream City, Convention Center, Bhimrad, Women ITI, VIP Road, Althan Gam, Althan Tenement, Rupali Canal, Majura Gate, Kadarsha Ni Nal, Chowk Bazaar, Maskati Hospital, Surat Railway Station, Central Warehouse, Labheswar Chowk, and Kapodra under Surat Metro Rail Project Phase – 1
Tender Award
Financing: KfW Entwicklungsbank
Project measures:
The German Financial Cooperation (FC) through KfW Development Bank (KfW) is supporting Bangladesh with an emphasis on Climate Change Adapted Urban Development (CCAUD), particularly through investments in urban infrastructure and project related capacity development.
CCAUD Phase II – Khulna (the “Project”) will focus on much needed improvements to stormwater drainage and flood control in Khulna City. The Project will build, rehabilitate and improve climate-resilient public urban...
Deadline: May 10, 2024
Financing: KfW Entwicklungsbank
Requested Services:
Carry out a diagnosis of the leakage situation in concrete and steel or vitrified steel tanks and carry out repair of leaks in the concrete tanks only, ensuring the sealing conditions and structural integrity of the tanks for the Instituto Costarricense de Acueductos y Alcantarillados (Water Supply and Wastewater Disposal)
Deadline: May 15, 2024
Financing: KfW Entwicklungsbank/ Europäische Investitionsbank (EIB)/ EU-Kommission/Europäische Union/ Agence Française de Développement (AFD)/ Swiss State Secretariat for Economic Affairs (SECO)
Requested Services:
Construction of Karm Omran Wastewater Treatment Plant, type: stabilization ponds project (capacity horizon 2040: 22,000 m³/d; load: 5,350 kg BOD/day)
Deadline: Apr 26, 2024
Financing: KfW Entwicklungsbank
Requested service:
design, engineering, manufacture, supply, erection, testing and commissioning of 2 x 25 MWAC crystalline grid interactive solar PV power project (with dry cleaning) along with associated power evacuation infrastructure arrangement including 5 years operation & maintenance at villages Malkhed und Mangladevi (district Yavatmal, state Maharashtra)