Hydroelectricity (43)
reset all filters

Search results

Hit: 43
  • Mar 11, 2024 Tender Notice Kenya Hydroelectricity
    store page page bookmarkeddownload

    Implementation of the 8.6MW Gogo Hydropower Redevelopment Project

    PQ-Result

    Financing: KfW Entwicklungsbank

    Requested Consulting Services:

    Currently, the Gogo hydropower plant has an installed capacity of 2 MW with two (2) power plant units of 1 MW each. The proposed project is concerned with the redevelopment of the Gogo hydropower plant with a capacity of 8.6 MW.
    The scope of the project includes but is not limited to the following activities:

    Desilting of the Dam

    Diversion of the water flow to facilitate works on the dam and bottom of the ground outlet, spillway, intake, e-flow...

  • Mar 05, 2024 Tender Notice Kenya Photovoltaics
    store page page bookmarkeddownload

    Consulting Services for a Feasibility Study on Floating Solar PV on Kamburu Hydropower Plant Reservoir

    PQ-Result

    Financing: KfW Entwicklungsbank

    Project
    A floating solar photovoltaic (FPV) project with a capacity of approx. 40 MWp is currently being developed by KenGen (Kenya Electricity Generating Company PLC). German bilateral Financial Cooperation (FC) funds are earmarked for this Project, which is being implemented by the German Development Bank (KfW)
    Requested Services
    Carry out a detailed feasibility study and to assess the technical, financial, environmental and social feasibility of the FPV power plant, to be installed on Kamburu...

  • Jan 15, 2024 Tender Notice Jordan Water Supply, Irrigation
    store page page bookmarkeddownload

    Consulting Services, Energy Efficiency (Water Sector)

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract:
    The water sector in Jordan is the biggest consumer of electrical energy due to the unfavorable topographical and hydrogeological situation in the country. The high energy consumption is mainly caused by inefficient water pumping and distribution systems and generates high operation costs of the water supply utilities. Furthermore, the use of electrical power produced of fossil sources (>95%) leads to high CO2-emissions. Consequently, the objective of the present...

  • Dec 22, 2023 Tender Notice Egypt Hydroelectricity
    store page page bookmarkeddownload

    Power Transformers, Rehabilitation of Hydro Power Plants

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract:
    The Project concerns the rehabilitation of the hydropower plants at Aswan High Dam, Aswan I and Aswan II. The main area of the rehabilitation shall be the replacement of power transformers.
    The following services are required from the supplier: Replacement of twelve (12) transformers including OFWF coolers at Aswan High Dam, replacement of five (5) transformers including OFWF coolers at Aswan I hydropower plant. At Aswan II hydropower plant two (2) OFAF cooled...

  • Nov 08, 2023 Tender Notice Bosnia and Herzegovina Hydroelectricity
    store page page bookmarkeddownload

    Consulting Services, Rehabilitation of Pumped-Storage Power Plant

    Tender Award

    Financing: KfW Entwicklungsbank

    Short description of the services tendered:
    As part of German Financial Cooperation (FC) with Bosnia and Herzegovina, the German Government and the Government of Bosnia and Herzegovina have agreed to rehabilitate and to modernize the Pumped-Storage Power Plant Čapljina (PSHPP Čapljina).
    To this end, a loan is to be provided for investment and consulting measures
    These consulting services include support in development of preliminary design concepts, procurement of goods including preparation of...

  • Oct 31, 2023 Tender Notice Albania Hydroelectricity
    store page page bookmarkeddownload

    Rehabilitation of Hydropower Plant Fierza

    Cancellation Notice KfW

    Financing: KfW Entwicklungsbank

    CANCELLATION OF TENDER!


    Fierza HPP is the upstream HPP of the Drin River Cascade, having an average production of 1,328 GWh per annum, with four Francis type generating units at 125 MW installed capacity each, a total of 500 MW installed capacity. The original turbine runners of Units 2 and 4 were replaced with new ones in frame of a limited rehabilitation program between 1996 and 2006.
    The scope of this project includes two new Francis runners, four new turbine wicket gates including...

  • Oct 24, 2023 Tender Notice Pakistan Hydroelectricity
    store page page bookmarkeddownload

    E&M Equipment for Small Hydropower Plants

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract:
    Supply, Installation, Commissioning of E&M Equipment for:
    1 MW Chalt-01 SHP
    1.5 MW Hassanabad-01 SHP and
    2 MW Sumayar-02 SHP

  • Jul 20, 2023 Tender Notice North Macedonia Hydroelectricity
    store page page bookmarkeddownload

    Consulting Services, Rehabilitation of Hydropower Plants

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract:

    Qualified independent consultants are invited to submit prequalification documents for consulting services for the implementation of the a.m. project. The Project concerns the rehabilitation six Hydro Power Plants in the Republic of North Macedonia. The Consultant shall support the PEA in its role as FIDIC owner’s representative under the FIDIC Yellow Book and FIDIC engineer under FIDIC Pink Book contracts.

  • Jun 09, 2023 Tender Notice Tunesia Hydroelectricity
    store page page bookmarkeddownload

    Consulting Services, Pumped Storage Power Station Tabarka

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract:
    Collection of geological and geotechnical data on the Pumped Storage Power Station in Tabarka, including sounding.
    The works mainly include:
    Core drilling with in situ testing and sampling for laboratory tests;
    Laboratory tests
    Pressiometer soundings (MASW and TDEM seismic)
    Preparation of geophysical profiles
    Reconnaissance wells

  • Apr 12, 2023 Tender Notice Pakistan Hydroelectricity
    store page page bookmarkeddownload

    Construction Works, Small Hydropower Plants (Sumayar)

    Cancellation Notice KfW

    Financing: KfW Entwicklungsbank

    TENDER CANCELLATION
    The Tender has been cancelled with reference to ITB 39.1. The tender will be re-launched.
    Construction of Sumayar 02 (2 x 1000 kW) SHP including construction of intake, settling basin, water conveying systems including penstock, powerhouses and foundations for E&M equipment, manufacturing, supply and installation of gates and other steel works. The SHP is located in Nagar District of Gilgit Baltistan, Pakistan