Tender Notice China Water Technologies

Construction Of Wastewater Treatment Plants, Water Systems and Carry out Landscape Management

Correction

  • Country China
  • Deadline Jun 12, 2024
  • Financing KfW Entwicklungsbank
  • Reference Number KfW507304; 0733-245023093875
  • Subject EPC Project for Urban Water Environment Improvement Project in Baofeng County

Project: 

The scope of the EPC Project for Urban Water Environment Improvement Project in Baofeng County includes the construction of Wastewater Treatment Plant in Daying Town, Wastewater Treatment Plant in Zhangbaqiao Town, smart water management system, related rainwater pipe network and wastewater collection network construction, as well as the design, procurement, construction, training, acceptance, and effluent quality compliance services for related river management projects. The design includes preliminary design, preliminary design approval work, and detailed construction drawing design.

Requested services: 

The Wastewater Treatment Plant in Daying Town will be designed on a recent design scale of 5000 m³/d. The design and treatment process adopt the “BIOCOS process+flocculation sedimentation+filter cloth rotary table” technology. A total of 49.445km of drainage and wastewater pipeline networks, along with corresponding end treatment facilities will be constructed.

The Wastewater Treatment Plant in Zhangbaqiao Town will be designed in accordance with a recent design scale of 5000 m³/d. And the treatment process adopts the “hydrolysis acidification +BIOCOS process+flocculation sedimentation+filter cloth rotary table” technology. A total of 43.005 km of drainage and wastewater pipeline network, along with corresponding end treatment facilities will be constructed.

The smart water system is built in the Wastewater Treatment Plant in Daying Town and is designed for monitoring and intelligent management of all constructions in this project.

For the 2.2 km central section of Jingchang River in Daying Town, river cleaning will be carried out, and 19,800 tons of mechanical dredging will be carried out. The sludge will be mixed and solidified with chemicals and used in situ to form a 15,840 m³ ecological slope protection for river water, 3960 m3 ISER Ecological Bottom Protection. Install landscape greening and lighting facilities for the moat in the old urban area of Daying Town, arrange 5000m2 of lawn in the 1.5km open ditch section, and plant 150 landscape trees and 150 sets of lighting decorative lights along the ditch.

 