Search results

Hit: 165
  • Dec 05, 2024 Tender Notice Ukraine Below-Ground Construction, Infrastructure
    store page page bookmarkeddownload

    Construction Services, Rehabilitation of Municipal Water Infrastructure

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief Description of the Contract:
    Rehabilitation of emergency sections of the WPS “Shubranets” - CWR “Popova” pressure water main DN = 900 mm with a total length of ~ 7 km in Chernivtsi city, Chernivtsi region. Lots 1 & 2.

  • Dec 04, 2024 Tender Notice Jordan Social Responsibility
    store page page bookmarkeddownload

    Gender and Social Awareness Consultant for Water Loss Reduction Programme

    Cancellation Notice KfW

    Financing: KfW Entwicklungsbank

    CANCELLATION OF TENDER NOTICE!

    Requested Services:
    The Gender and Social Awareness Consultant (GCAS) shall assist WAJ in preparing and implementing a gender strategy for the Water Loss Reduction Programme and support the implementation of the project and its sustainability through various types of community engagements and assistance in case of conflicts as well as with other tasks foreseen in the Project´s scope including:
    Prepare a project-related conflict analysis
    Prepare a Gender Action...

  • Dec 02, 2024 Tender Notice Morocco Architecture, Engineering Services
    store page page bookmarkeddownload

    Construction Works to Strengthen the Drinking Water Supply of Sidi Allal El Bahraoui and the Commune of Shoul

    Deadline: Jan 21, 2025

    Financing: KfW Entwicklungsbank

    Requested Services: ONEE - Water Branch plans to achieve the current project to strengthen the drinking water supply of Sidi Allal El Bahraoui and the commune of Shoul. The works covered by this project: Civil Engineering 2 (lot 2), consists to realize:

    Component 1: Departure complex in the commune of Ameur, Prefecture of Salé
    The creation of a 1000 m3 half-buried water tank;
    The creation of a resumption station;
    The construction of a 22KV/400V station for the transformer;
    The creation of a lodge...

  • Nov 21, 2024 Tender Notice Namibia Water Supply, Irrigation
    store page page bookmarkeddownload

    Construction Services, Water Pipeline Replacement (Schwarzekuppe - Swakopmund)

    PQ-Result

    Financing: KfW Entwicklungsbank

    Requested Services:
    Construction Services for Schwarzekuppe - Swakopmund Water Pipeline
    Replacement Sections 6B and 6C

  • Nov 21, 2024 Tender Notice Namibia Water Supply, Irrigation
    store page page bookmarkeddownload

    Construction Services, Water Pipeline Replacement (Omdel - Wlotzkasbaken)

    PQ-Result

    Financing: KfW Entwicklungsbank

    Requested Services:
    Construction Services for Omdel - Wlotzkasbaken Water Pipeline Replacement

  • Nov 19, 2024 Tender Notice Jordan Water Supply, Irrigation
    store page page bookmarkeddownload

    Construction, Rehabilitation of Irrigation Systems in Jordan Valley

    Expression of Interest - Prequalification

    Deadline: Dec 23, 2024

    Financing: KfW Entwicklungsbank

    Project:
    The aim of the project is to rehabilitate the existing irrigation networks includes priority DAs in the Southern Ghor, parts of the North Ghor, and parts of the Middle Ghor to raise the efficiency of the project, improve the irrigation delivery services (flow and head) to the farm units, reduce water losses (physical and administrative), and proper use for water to Improve the performance of irrigation network and increasing efficiency of water distribution in the project area.

    Requested...

  • Nov 12, 2024 Tender Notice Jordan Project Management, Evaluation
    store page page bookmarkeddownload

    Consulting Services for Management and Evaluation Consultant (Water Sector)

    Prequalification

    Deadline: Dec 16, 2024

    Financing: KfW Entwicklungsbank

    Project:
    As response to the to the financial and operational challenges in Jordan, the German Government, through KfW Development Bank, has supported the Jordanian Government since 2021 with a “Results-based Financing” (RBF) grant. RBF was set up as a funds for small to medium-scale gap-filling investments to improve the performance of the existing infrastructure. As of now, the RBF will enter its second phase (“RBF II”) and will be divided into two components:
    • C1: Small to medium gap-filling...

  • Nov 11, 2024 Tender Notice Uganda Environmental Technologies
    store page page bookmarkeddownload

    Consulting Services, Climate Resilience and Water Infrastructure for Refugees and Host Communities in Northern Uganda

    Tender Award

    Financing: KfW Entwicklungsbank

    Project
    The Ministry of Water and Environment, MWE, is seeking to engage a qualified Project Management and Implementation Consultant, PMIC, to perform Consulting Services to support the Project Management and Implementation of a Water and Sanitation Programme in Northern Uganda, which consists of 3 different components.
    Brief Description of the Contract:
    Interventions are financed through 3 specific, financial streams with each having specific objectives and indicators. The 3 components are the...

  • Nov 07, 2024 Tender Notice Uganda Environmental Technologies
    store page page bookmarkeddownload

    Consulting Services, Feasibility Study for Water Dam Construction

    Tender Award

    Financing: KfW Entwicklungsbank

    Project
    The proposed project foresees a dam on river Enyau with an appropriately sized storage reservoir to cover dry periods of up to six months and twice the demand of year 2040.
    Brief Description of the Contract:
    The IMC’s main tasks comprise:
    Review of available Pre-feasibility Study and in particular related hydrological, geological, and geotechnical information,
    Based on the review verification and/or optimization of project layout as well as determination of additional investigations to...

  • Nov 05, 2024 Tender Notice Costa Rica Water Supply, Irrigation
    store page page bookmarkeddownload

    Supervision of Improvement Works and Commissioning of Pumping Stations

    Deadline: Dec 13, 2024

    Financing: KfW Entwicklungsbank

    Requested Services:
    Advisory and supervision service for energy efficiency optimization works in the pumping stations of the aqueducts selected and operated by the AyA that will be intervened through the tender "Improvement Works and Commissioning Into Service of the Pumping Stations of the GAM Systems and Peripheral Systems: La Libertad, Los Cuadros, Ipís, San Isidro, Escazú, Potrerillos, Liberia, Puntarenas and San Ramón", including the technical advisory services in charge of the aforementioned...