Consulting Services, Market Sounding for Wastewater
Deadline: Aug 28, 2024
Financing: KfW Entwicklungsbank
Requested services:
Market sounding for the BOT Project for new Roche-Bois Pump Station and new Baie du Tombeau wastewater treatment plant
Your company is already operating in Germany and you would now like to export worldwide?
Deadline: Aug 28, 2024
Financing: KfW Entwicklungsbank
Requested services:
Market sounding for the BOT Project for new Roche-Bois Pump Station and new Baie du Tombeau wastewater treatment plant
Deadline: Aug 22, 2024
Financing: KfW Entwicklungsbank
Requested Services:
the work content of this project includes the following parts: Wenshan Zhuang and Miao Autonomous Prefecture Hospital of Traditional Chinese Medicine Utilizing German Promotional Loan Civil engineering includes but not limited to: main civil structure, decoration, electrical engineering, HVAC engineering, weak electrical engineering, water supply and drainage, fire fighting, etc
PQ-Result
Financing: KfW Entwicklungsbank
Requested services:
Consulting services for the preparation of a feasibility study for the selection of the programme towns including technical concept planning, environmental, social, health and safety assessment as well as the analysis of further positive technical, financial, environmental, climate-adapted and social aspects.
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
technical assistance for a potable water supply programme (PMC 3)
Deadline Extension/ Prequalification
Deadline: Aug 06, 2024
Financing: KfW Entwicklungsbank
Requested Services:
for the securing Windhoek water supply, Gammams direct potable reclamation plant and securing Windhoek water supply ii, Gammams and Otjomuise wastewater treatment plants and associated facilities project.
Lot 1: Consultant for DBO and construction contracts
The Consultancy Services for the construction of an additional Direct Potable Reclamation Plant (DPR 2), and related linkages and site development measures as well as for the rehabilitation and extension of Gammams and...
Prequalification
Deadline: Aug 22, 2024
Financing: KfW Entwicklungsbank
Requested Services:
The Gender and Social Awareness Consultant (GCAS) shall assist WAJ in preparing and implementing a gender strategy for the Water Loss Reduction Programme and support the implementation of the project and its sustainability through various types of community engagements and assistance in case of conflicts as well as with other tasks foreseen in the Project´s scope including:
Prepare a project-related conflict analysis
Prepare a Gender Action Plan (GAP)
Develop strategies that...
Deadline: Aug 20, 2024
Financing: KfW Entwicklungsbank
Requested services:
Preparation of the detailed design documents (Stage R) including hydraulic modelling and undertaking all coordination’s needed to perform the requested Works.
Construction of the pressure regulation chambers and Installation of pressure regulating valves (PRV) with all needed materials and equipment for flow and pressure monitoring.
Installation of measurement and SCADA equipment in the chambers and monitoring equipment in the Employer’s main building (FIDIC Pink Book)
Deadline: Aug 27, 2024
Financing: KfW Entwicklungsbank
Project:
The above mentioned project aims at improving the potable water distribution and sanitation in Abomey-Calavi and its surroundings, especially in Adjagbo (lot 1).
Requested services:
Fixed tranche:
Supply and laying of 27 km pipes (UPVC; DE 75 mm - 225 mm)
Supply and laying of 17.8 km pipes (PEHD; DE 560 mm and 710 mm)
Construction and supply of equipment for appurtenant works
Conditional tranche :
Supply and laying of 142.3 km pipes (UPVC; DE 75 mm - 225 mm)
Construction and supply...
PQ-Result
Financing: KfW Entwicklungsbank
Project:
Improvement of water supply and sanitation services in 4 growth centres in Mtwara and Lindi Regions: (1) Mchiga and Likokona; (2) Liwale, (3) Nyengedi, Mtua, Longa and Kiwalala; (4) Pande, Mikoma, and Lihimalyao
Requested services:
Feasibility studies: Hydrogeological investigations; concept design and construction of horizontal filtration wells or other water extraction methods in soils with low transmissibility; concept of water supply system in small towns; assessment of the effects...
PQ-Result
Financing: KfW Entwicklungsbank
Project:
The Project shall provide financing for water loss reduction and other related measures for an approximate total investment volume of EUR 50-70 million in the Mafraq Regional Operating Unit (ROU) located in the northern part of Jordan. The following measures shall be implemented under the Project:
Network restructuring and establishment of district metered areas (DMAs)
Rehabilitation/replacement of primary, secondary and tertiary pipes
Installation/replacement of water meters (house and bulk...