Brief description of the Contract:
The PEA is in process of developing and procuring a solar PV power plant (PVPP) with a capacity of ca. 125 MWAC (the "Project") for which KfW intends to provide financing in form of a promotional loan. The Project site is located in Goaltore ca. 170k west of Calcutta. The Project will be implemented through a turnkey Engineering, Procurement and Construction (EPC) Contract including five years of operation and maintenance (O&M). Procurement of the EPC s expected to commence in February 2022.
The Consultant’s task is to support the PEA during Project implementation. In particular, the Consultant shall assist the PEA in:
- review of the detailed engineering design proposed by the EPC contractor;
- supervise the works and installation of the PVPP through the EPC contractor until commissioning;
- report to KfW as well as disbursement management and cost controlling, and
- monitoring of compliance with environmental and social health standards (ESHS) in compliance with World Bank Environmental and Social Standards (ESS) and the World Bank Group General and sector-specific Environmental Health and Safety (EHS) Guidelines.