Tender Notice Kosovo Building Industry
Construction, Rehabilitation of Landfill Sites and Construction of Critical Infrastructure (Solid Waste Management)
Prequalification
Feb 12, 2026
- Country Kosovo
- Deadline Mar 31, 2026
- Financing KfW Entwicklungsbank
- Reference Number BMZ201667591/201670041/201867571/202067932/KfW513598
- Subject Kosovo Solid Waste Management Program II – IV
Requested Services:
The Solid Waste Management Program II – IV (the “Programme”) jointly financed by KfW, the Government of the Republic of Kosovo, and contributions from the European Union addresses critical solid waste infrastructure needs across Kosovo and aims to establish a sustainable and environmentally sound waste management system aligning national practices with EU standards. The project covers the four administrative regions Pristina, Gjilan, Peja and Prizren, and five infrastructure locations, with a focus on extension of existing landfills, improving landfill infrastructure and closing of one uncontrolled dumpsite.
1: Prizren landfill
Extension of landfill approx. 80,000 m²
Construction of buildings and infrastructure
Closure and capping of parts of the existing cell
Leachate Treatment Plant - Biological Membrane Reactor (MBR)
Landfill degasification and landfill gas treatment
Supply of equipment for landfill operation2: Gjilan landfill
Extension of landfill approx. 54.000 m2
Construction of buildings and infrastructure
Closure capping of parts of the existing cell, with a volume of waste relocation approx. 95.000 m3, profiling and compaction
Leachate Treatment Plant - Biological Membrane Reactor (MBR)
Landfill degasification and landfill gas treatment
Supply of equipment for landfill operation3: Peja landfill
Extension of landfill, approx. 50,600 m2
Construction of buildings and infrastructure
Closure capping of parts of the existing cell with a volume of waste relocation approx. 100.000 m3, profiling and compaction
Leachate Treatment Plant - Biological Membrane Reactor (MBR)
Supply of equipment for landfill operation4: Podujeva landfill
Rehabilitation of parts of the existing cell
Construction of buildings and infrastructure
Leachate Treatment Plant - Biological Membrane Reactor (MBR)
Supply of equipment for landfill operation5: Istog dumpsite
Closure capping of the whole dumpsite approx. 30.000 m2
Passive degasification
The time frame for implementation of the works is 24 months. The defects notification period shall be 12 months after issue of Taking-Over-Certificate.