Tender Notice Kosovo Building Industry

Construction, Rehabilitation of Landfill Sites and Construction of Critical Infrastructure (Solid Waste Management)

Prequalification

  • Country Kosovo
  • Deadline Mar 31, 2026
  • Financing KfW Entwicklungsbank
  • Reference Number BMZ201667591/201670041/201867571/202067932/KfW513598
  • Subject Kosovo Solid Waste Management Program II – IV

Requested Services:

  • The Solid Waste Management Program II – IV (the “Programme”) jointly financed by KfW, the Government of the Republic of Kosovo, and contributions from the European Union addresses critical solid waste infrastructure needs across Kosovo and aims to establish a sustainable and environmentally sound waste management system aligning national practices with EU standards. The project covers the four administrative regions Pristina, Gjilan, Peja and Prizren, and five infrastructure locations, with a focus on extension of existing landfills, improving landfill infrastructure and closing of one uncontrolled dumpsite.

    1: Prizren landfill

    Extension of landfill approx. 80,000 m²
    Construction of buildings and infrastructure
    Closure and capping of parts of the existing cell
    Leachate Treatment Plant - Biological Membrane Reactor (MBR)
    Landfill degasification and landfill gas treatment
    Supply of equipment for landfill operation

    2: Gjilan landfill

    Extension of landfill approx. 54.000 m2
    Construction of buildings and infrastructure
    Closure capping of parts of the existing cell, with a volume of waste relocation approx. 95.000 m3, profiling and compaction
    Leachate Treatment Plant - Biological Membrane Reactor (MBR)
    Landfill degasification and landfill gas treatment
    Supply of equipment for landfill operation

     

    3: Peja landfill

    Extension of landfill, approx. 50,600 m2
    Construction of buildings and infrastructure
    Closure capping of parts of the existing cell with a volume of waste relocation approx. 100.000 m3, profiling and compaction
    Leachate Treatment Plant - Biological Membrane Reactor (MBR)
    Supply of equipment for landfill operation

    4: Podujeva landfill

    Rehabilitation of parts of the existing cell
    Construction of buildings and infrastructure
    Leachate Treatment Plant - Biological Membrane Reactor (MBR)
    Supply of equipment for landfill operation

    5: Istog dumpsite

    Closure capping of the whole dumpsite approx. 30.000 m2
    Passive degasification
     

    The time frame for implementation of the works is 24 months. The defects notification period shall be 12 months after issue of Taking-Over-Certificate.

You must be logged in to access this page

Please click "Log in" to log in with your user details. If you do not have a GTAI user account yet, you can sign up free of charge in order to have access to all our services and information. Sign up now.

go to top
Log in

Please log in on this page with your log-in details.