Tender Notice North Macedonia Wind Industry

Engineering and Construction, Windpark Project Bogdanci - Balance of Plant

Tender Award

  • Country North Macedonia
  • Financing KfW Entwicklungsbank
  • Reference Number BMZ 201366889/KFW505913
  • Subject Project "Windpark Bogdanci - Phase II"

Project Measures:

The Project concerns the extension of the existing wind farm Bogdanci with an expected additional capacity of 13.2-15 MW.

Tender 2: Balance of plant

  • Internal cable network (MV network and fiber optic cables)
  • Connection to the existing Bogdanci substation
  • Internal roads
  • Civil works for crane platforms and temporary storage areas

Brief Description of the Contract:

General project mangement;

  • Design and engineering (necessary changes to design for building permit, the execution design and the as-built design)
  • Procurement of necessary equipment and machinery
  • Permitting procedure
  • Providing all necessary standard and application programs (software)
  • Validating the load-bearing capacity (if necessary) of the designed internal roads, if necessary, other areas necessary to build all wind turbines
  • Any other tests necessary for the construction of internal roads
  • Insurance, transport
  • Site infrastructure
  • Commissioning
  • Operational acceptance
  • Support and contractual obligations related to defects removal within the guarantee period
  • Documentation

 

 