Your company is already operating in Germany and you would now like to export worldwide?

Tender Notice Zambia Solar Energy

Construction of Solar PV Power Generating Systems and Replacement & Rehabilitation of Pumps System

Expression of Interest - Prequalification

  • Country Zambia
  • Deadline Dec 09, 2025
  • Financing KfW Entwicklungsbank, EU-Kommission/Europäische Union
  • Reference Number BMZ202467280/KfW58076/59147/512412; 700002296
  • Subject The Nexus Energy Water Programme for Zambia (NEWZA)

Requested Services: 

  • Qualified contractors are invited to submit applications for the design, engineering, supply, construction, erection, testing, commissioning, and operation & maintenance of 25.5 MW of Solar PV power systems (5kW to 2.5MW) as well as the replacement and rehabilitation of pumping equipment at various water stations in Zambia. 

    The project is part of the Nexus Energy Water Programme for Zambia (NEWZA), co-funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ) through KfW. It aims to strengthen the energy–water nexus by improving the efficiency and sustainability of five Zambian water utilities (Southern, Chambeshi, Lukanga, Nkana, Eastern). 

    Key objectives include achieving 55% solar-based energy coverage of pumping systems, increasing pumping efficiency by 15%, and introducing hybrid solar systems at high-risk load-shedding sites. The works will follow the FIDIC Plant and Design-Build Contract (Yellow Book, 1st edition 1999). 

You must be logged in to access this page

Please click "Log in" to log in with your user details. If you do not have a GTAI user account yet, you can sign up free of charge in order to have access to all our services and information. Sign up now.

go to top
Log in

Please log in on this page with your log-in details.