Design and Construction, Drinking Water Treatment Plant
Tender Award
Financing:
KfW Entwicklungsbank
Brief description of the Contract:
Design and construction of a 400 m3/h drinking water treatment plant including raw water intake with primary treatment, 18 km raw water gravity pipeline (ductile iron DN600 and DN350), refurbishment of the existing water treatment plant with a capacity of 200 m3/h, 2 pumping stations, 2 water towers (500 and 300 m3) and a 800 m3 ground reservoir, electricity supply, control–command for automatic operation. The Time for Completion for design and construction is 730...