Your company is already operating in Germany and you would now like to export worldwide?

Search

Hydroelectricity (39)
reset all filters

Search results

Hit: 39
  • Nov 27, 2024 Tender Notice North Macedonia Hydroelectricity
    store page page bookmarkeddownload

    Rehabilitation of Hydropower Plants (Lot 1)

    PQ-Result

    Financing: KfW Entwicklungsbank

    Requested services:

    Plant and Design-Build services for the implementation of the a.m. project. The Project concerns the rehabilitation of six Hydro Power Plants in the Republic of North Macedonia. The scope covered under this assignment is planned to be implemented under the FIDIC general conditions of contract (Yellow Book) (
    LOT 1 – Generators and Turbines

  • Nov 25, 2024 Tender Notice Indonesia Project Management, Evaluation
    store page page bookmarkeddownload

    Consulting, Feasibility Study for Pumped Storage Hydropower Plant (Sumatra)

    PQ-Result

    Financing: KfW Entwicklungsbank

    Requested services:
    Procurement of consultancy services for the feasibility study for the Sumatra pumped storage hydropower plant project

  • Nov 25, 2024 Tender Notice Indonesia Project Management, Evaluation
    store page page bookmarkeddownload

    Consulting, Feasibility Study for Pumped Storage Hydropower Plant (Grindulu)

    PQ-Result

    Financing: KfW Entwicklungsbank

    Requested services:
    Procurement of consultancy services for the feasibility study for the Grindulu pumped storage hydropower plant project

  • Nov 07, 2024 Tender Notice Uganda Environmental Technologies
    store page page bookmarkeddownload

    Consulting Services, Feasibility Study for Water Dam Construction

    Tender Award

    Financing: KfW Entwicklungsbank

    Project
    The proposed project foresees a dam on river Enyau with an appropriately sized storage reservoir to cover dry periods of up to six months and twice the demand of year 2040.
    Brief Description of the Contract:
    The IMC’s main tasks comprise:
    Review of available Pre-feasibility Study and in particular related hydrological, geological, and geotechnical information,
    Based on the review verification and/or optimization of project layout as well as determination of additional investigations to...

  • Sep 13, 2024 Tender Notice North Macedonia Hydroelectricity
    store page page bookmarkeddownload

    Construction/Supply, Flow Measurement and Dam Monitoring System (Lot 5)

    PQ-Result

    Financing: KfW Entwicklungsbank

    Project:

    The Project is the third rehabilitation phase of the Six Hydro Power Plants Programme and comprises several mechanical, electrical and construction measures for the rehabilitation of six large Hydropower Plants (HPP) in the Republic of North Macedonia, owned by ESM (HPP Vrutok, HPP Vrben; HPP Raven; HPP Tikves; HPP Spilje; HPP Globochica), as well as on two dams (Mavrovo and Globocica) and other associated structures.

    Requested Services:

    Plant and Design-Build services for the...

  • Jul 17, 2024 Tender Notice North Macedonia Hydroelectricity
    store page page bookmarkeddownload

    Construction/Supply, Generators and Turbines (Hydropower) (Lot 3)

    Cancellation Notice KfW

    Financing: KfW Entwicklungsbank

    CANCELLATION OF TENDER
    as none of the technical Proposals meet the minimum requirements.


    Project:

    The Project is the third rehabilitation phase of the Six Hydro Power Plants Programme and comprises several mechanical, electrical and construction measures for the rehabilitation of six large Hydropower Plants (HPP) in the Republic of North Macedonia, owned by ESM (HPP Vrutok, HPP Vrben; HPP Raven; HPP Tikves; HPP Spilje; HPP Globochica), as well as on two dams (Mavrovo and Globochica) and other...

  • Jul 17, 2024 Tender Notice North Macedonia Hydroelectricity
    store page page bookmarkeddownload

    Construction/Supply, Generators and Turbines (Hydropower) (Lot 1)

    Cancellation Notice KfW

    Financing: KfW Entwicklungsbank

    CANCELLLATION OF TENDER
    as none of the technical Proposals meet the minimum requirements.

    Project:

    The Project is the third rehabilitation phase of the Six Hydro Power Plants Programme and comprises several mechanical, electrical and construction measures for the rehabilitation of six large Hydropower Plants (HPP) in the Republic of North Macedonia, owned by ESM (HPP Vrutok, HPP Vrben; HPP Raven; HPP Tikves; HPP Spilje; HPP Globochica), as well as on two dams (Mavrovo and Globochica) and other...

  • Apr 16, 2024 Tender Notice Madagaskar Hydroelectricity
    store page page bookmarkeddownload

    Consulting Services, Construction of a Hydroelectric Power Plant and of Power Lines

    Cancellation Notice KfW

    Financing: KfW Entwicklungsbank

    CANCELLATION OF TENDER NOTICE!

    Requested Services
    Control and Surveillance of construction works for a hydroelectric power plant (8 MW) and power lines
    Lot 1: construction of a dam an hydroelectric power plant
    Lot 2: construction of medium voltage power lines
    The original document in French language is available for download!

  • Jan 15, 2024 Tender Notice Jordan Water Supply, Irrigation
    store page page bookmarkeddownload

    Consulting Services, Energy Efficiency (Water Sector)

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract:
    The water sector in Jordan is the biggest consumer of electrical energy due to the unfavorable topographical and hydrogeological situation in the country. The high energy consumption is mainly caused by inefficient water pumping and distribution systems and generates high operation costs of the water supply utilities. Furthermore, the use of electrical power produced of fossil sources (>95%) leads to high CO2-emissions. Consequently, the objective of the present...

  • Dec 22, 2023 Tender Notice Egypt Hydroelectricity
    store page page bookmarkeddownload

    Power Transformers, Rehabilitation of Hydro Power Plants

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract:
    The Project concerns the rehabilitation of the hydropower plants at Aswan High Dam, Aswan I and Aswan II. The main area of the rehabilitation shall be the replacement of power transformers.
    The following services are required from the supplier: Replacement of twelve (12) transformers including OFWF coolers at Aswan High Dam, replacement of five (5) transformers including OFWF coolers at Aswan I hydropower plant. At Aswan II hydropower plant two (2) OFAF cooled...

Log in

Please log in on this page with your log-in details.