Growth Expected for German Health, IT, Materials SMEs
The 2022 Top 100 of medium-sized German companies with the best growth prospects shows a clear trend toward a trio of sectors.
Your company is already operating in Germany and you would now like to export worldwide?
The 2022 Top 100 of medium-sized German companies with the best growth prospects shows a clear trend toward a trio of sectors.
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
The Government of the Hashemite Kingdom of Jordan through the Water Authority of Jordan (WAJ) has applied for finance from the Government of the Federal Republic of Germany through the German Development Bank KfW towards the costs for a feasibility study on water supply including water treatment for Wala Dam, Wala- and Hidan Wellfields and improvement of the water distribution network in Madaba City.
Requested Services:
The objective of the current assignment is to...
Tender Award
Financing: KfW Entwicklungsbank
Short description of the services tendered:
As part of German Financial Cooperation (FC) with Bosnia and Herzegovina, the German Government and the Government of Bosnia and Herzegovina have agreed to rehabilitate and to modernize the Pumped-Storage Power Plant Čapljina (PSHPP Čapljina).
To this end, a loan is to be provided for investment and consulting measures
These consulting services include support in development of preliminary design concepts, procurement of goods including preparation of...
The town of Merklingen in southern Germany has set a new record for the number of electric vehicles that can be repowered at a single installation – and it’s solar powered.
Cancellation Notice KfW
Financing: KfW Entwicklungsbank
CANCELLATION OF TENDER
Reason: Revision of items and technical specifications are needed.
Requested Services:
Supply, delivery, unloading, installation, putting into operation, inspection, testing, training and warranty services of equipment to be used for Vocational Education Institutions. The tender is divided into 11 (eleven) lots.
LOT 1: CNC VERTICAL MILLING MACHINE
LOT 2: CNC MACHINERY
LOT 3: GRINDING MACHINERY AND BENCH DRILL
LOT 4: ROUTERS
LOT 5: LATHE
LOT 6: PRESS MACHINERY
LOT...
Cancellation Notice KfW
Financing: KfW Entwicklungsbank
CANCELLATION OF TENDER
The tender was cancelled as no bidder achieved the required technical score.
Project:
Environmentally sustainable, climate resilient and green economic growth is an established development priority of the Government of Rwanda. Since 2005, Rwanda has worked to operationalise a sustainable financing mechanism in order to achieve these objectives, known as the ‘National Fund for Environment’ – FONERWA. As a national fund, FONERWA is both an instrument to facilitate direct...
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
supply of goods and construction works for the rehabilitation of the district heating plant (boiler house) Cerak in Belgrade, which operates the three hot water boilers VK1 (58MW), VK2 (58 MW) and VK3 (116 MW)
Cancellation Notice KfW
Financing: KfW Entwicklungsbank
CANCELLATION OF TENDER NOTICE!
The reason for cancelling the tender notice was a lack of competition and the fact that none of the technical proposals met the minimum requirements.
Requested Services:
Rehabilitation of the Fish Hatchery building, excavation of external fishponds and drainage system, supply of technical materials, rehabilitation of the electricity system, sewage system, and water system in Ana
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
The overall objective of the Project will be reached by the construction two wastewater treatment plants in Daying and Zhangbaqiao and the associated sewage pipeline network
The task of the Consultant is to support the Employer as well as the Design Institute(s) and the Window Company during Project preparation and implementation:
During preparation and implementation of the project, in particular during review of the detailed engineering design and review of the...
Cancellation Notice KfW
Financing: KfW Entwicklungsbank
CANCELLATION OF TENDER!
Fierza HPP is the upstream HPP of the Drin River Cascade, having an average production of 1,328 GWh per annum, with four Francis type generating units at 125 MW installed capacity each, a total of 500 MW installed capacity. The original turbine runners of Units 2 and 4 were replaced with new ones in frame of a limited rehabilitation program between 1996 and 2006.
The scope of this project includes two new Francis runners, four new turbine wicket gates including...