Construction of the Improvement and Expansion of the Drinking Water System for the City of Guácimo, Limón, Costa Rica
Deadline: Nov 11, 2025
Financing: KfW Entwicklungsbank/ Banco Centroamericano de Integracion Economica (BCIE)
Requested Services:
Three DN300 outlet pipes will be installed at the source of La Angelina, each with its respective shut-off valve of the same diameter. The distribution of these pipes is as follows: an existing DN300 HF pipe to the La Angelina tank, an existing DN300 PVC pipe to the Selva and La Cabaña tanks (1) and (3), and a new DN300 HD pipe that will be installed on a direct route to the new Calle Bosque and TQG tanks.
The existing pipes and valves will be replaced due to wear due to corrosion...