Your company is already operating in Germany and you would now like to export worldwide?

Tender Notice Albania Recycling & Waste Management

Supply, Assembly and Construction Measures (Waste Management)

  • Country Albania
  • Deadline Feb 18, 2026
  • Financing KfW Entwicklungsbank
  • Reference Number VLORA-BMZ201366459/KFW513003
  • Subject Integrated Solid Waste Management Programme – Vlora, Albania

Requested Services:

  • Supply, assembly and construction of measures adding to and/or finalising already partially completed facilities for a modern integrated solid waste management and landfill site in Sherishtë, near Vlora. The Works will be implemented as three (3) Lots. Applicants are required to bid for all Lots which will be awarded as one (1) single Works Contract, whereby all Works are tendered according to KfW Standard Bidding Documents - FIDIC Pink Book.

    The Works/three (3) Lots principally comprise

    Lot 1 - Civil Works:

    Finalisation works for the already built: Leachate collection manholes, landfill ring road, landfill gas collection units etc.

    Earth-retaining structure with bored piles

    Erosion slope protection

    Improvement of Surface Water Managements: Closure of Surface Water Retention Pool, construction and rehabilitation of concrete channels, etc.

    Leachate Management: Mechanical protection of the ponds

    Site Infrastructures: Installation of guardrails, planting of trees, etc.

    Auxiliary Buildings: Joinery, indoor finishing, furniture’s, laboratory equipment, hardware & software, water heating, equipment, etc.

    Material Recovery Facility: Joinery, furniture’s, hardware & software, retaining wall, earthworks and road works, reinstatement of infrastructure, etc.

    Vlora Municipal Depot: Furniture, hardware & software, equipment, etc.
     

    Lot 2 - Electrical Works:

    Site infrastructure: Cables, external lighting, IT network & CCTV, etc.

    Auxiliary Buildings: Cables, IT network & CCTV, air conditioners, firefighting etc.

    Power transformer station: Finishing of civil works, commissioning etc.

    Material Recovery Facility: Cables, lighting, IT network & CCTV, air conditioners, firefighting, etc.

    Vlora Municipal Depot: Cables, equipment and connections, lightning pole, firefighting, etc.
     

    Lot 3 - Hydraulic Works:

    Sewerage: Testing the network, finishing works for septic tank, etc.

    Water supply: Technical water container equipment, etc.

    Technical / service water: Pipe laying, galvanized pipes, fittings, etc.

    Firefighting network: Pumping system, hydrants, pressure testing

    Auxiliary buildings: Sanitary equipment etc.

    Material Recovery Facility: Sprinkler system, hydrants, etc.

    Vlora Municipal Depot: Pressure, testing, disinfection, etc.

You must be logged in to access this page

Please click "Log in" to log in with your user details. If you do not have a GTAI user account yet, you can sign up free of charge in order to have access to all our services and information. Sign up now.

go to top
Log in

Please log in on this page with your log-in details.