Tender Notice Bolivia Water Supply, Irrigation

Construction of a Water Conveyance System

Cancellation Notice KfW

  • Country Bolivia
  • Financing KfW Entwicklungsbank
  • Reference Number BMZ200965608
  • Subject Sucre III Water Supply Project
  • Further Information Financing: 71,7% KfW, 28,3% Plurinational State of Bolivia, Regional Government of Chuquisaca, Municipality of Sucre and ELAPAS

CANCELLATION OF TENDER!

“In application of Section I, Sub-Clause 26.1 (Conformity of the Qualification Documents), the only Bidder’s qualification document was deemed to be not substantially responsive to the requirements of the bidding document”


Lot 3: Construction of a water conveyance system

  • Three tunnels with a total length of 7,754 m (Fisculco tunnel: 5.484 km; Aritu Mayu tunnel: 0.21 km; Punilla tunnel: 2.06 km) with a main horseshoe-shaped tunnel section of 10 m2.
  • Interconnections between Fisculco – Aritu Mayu and Aritu Mayu – Punilla tunnels, consisting of an embankment (of 103 m crown length made up of tunnel extracted materials) and a posttensioned concrete bridge aqueduct (with a total length of 157 m + 56 m of accesses) respectively.
  • Main pipeline conveyance made up of following stretches:
  • 8.15 km Fiberglass Reinforced Plastic (GRP) pipe, ø = 1,200 mm, free surface flow (the pipeline will be installed inside the completed tunnels and on top of the interconnection structures)
  • 0.85 km High Density Polyethylene (HDPE) buried pipe, ø = 1,200 mm, free surface flow
  • 1.22 km GRP pipe, ø = 900 mm (Santa Catalina Pressure Pipe)