Tender Notice Costa Rica Below-Ground Construction, Infrastructure

Construction of the Improvement and Expansion of the Drinking Water System for the City of Guácimo, Limón, Costa Rica

  • Country Costa Rica
  • Deadline Nov 11, 2025
  • Financing KfW Entwicklungsbank, Banco Centroamericano de Integracion Economica (BCIE)
  • Reference Number KfW513071; 2025LY-000020-0021400001
  • Subject Drinking Water and Sewerage Program in Coastal Cities

Requested Services:

  • Three DN300 outlet pipes will be installed at the source of La Angelina, each with its respective shut-off valve of the same diameter. The distribution of these pipes is as follows: an existing DN300 HF pipe to the La Angelina tank, an existing DN300 PVC pipe to the Selva and La Cabaña tanks (1) and (3), and a new DN300 HD pipe that will be installed on a direct route to the new Calle Bosque and TQG tanks.
  • The existing pipes and valves will be replaced due to wear due to corrosion and connected to a new collection tank. To utilize the excess water from the La Roca 7B intake, water from both sources (7A and 7B) will be collected in a collection tank that will be connected to the existing DN300 PVC pipe leading to the La Roca tank.
  • Construction of a supply line from the La Angelina Spring to the Calle Bosque tank and the slope break tank, with a length of 7.78 km.
  • Construction of the 3.13 km long water supply line from the break-gradient tank to the Guaira tank.
  • Construction of the water supply line from the La Roca Spring, passing through the La Angelina tank to the La Roca tank, with a total length of 540 m, of which 166.5 m will be laid with new DN 250 mm HDPE pipe.
  • Construction of the La Roca storage tank with a capacity of 750 m3.
  • Construction of the La Selva storage tank with a capacity of 700 m3.
  • Demolition of the La Cabaña 2 storage tank and construction of a new La Cabaña 3 storage tank with a capacity of 356 m3.
  • Construction of the Calle Bosque storage tank with a capacity of 900 m3 and a break-gradient tank of 11.2 m3.
  • Supply and installation of a Guaira vitrified steel tank with a storage capacity of 2,300 m3, which will have the necessary accessories and connections for proper operation and functioning.
  • Improvements to the Angelina Tank equipment are required, including the adjustment of accessories and the addition of macro-measurement, automation, and telemetry equipment.
  • Improvements to the distribution networks in the areas served by the following tanks: La Roca tank; La Selva tank; Cabaña 1 and 3 tank; Calle Bosque tank; Guaira and La Angelina tanks.

You must be logged in to access this page

Please click "Log in" to log in with your user details. If you do not have a GTAI user account yet, you can sign up free of charge in order to have access to all our services and information. Sign up now.

go to top
Log in

Please log in on this page with your log-in details.