Tender Notice Uganda Hydroelectricity
Civil Engineering/Construction/Supplies, Hydropower Project
Cancellation Notice KfW
Dec 22, 2021
- Country Uganda
- Financing KfW Entwicklungsbank
- Reference Number Tender No.: UEGCL/WRKS/2017/0001; BMZ201365865
- Subject Project Name: Muzizi Hydropower Project (48 MW)
After unsuccessful negotiations, the competition for the hydropower project Muzizi in Uganda is to be cancelled.
The reason for this is the high price and the lack of budget.
----------------------------------------------------------------------------------
Short description:
The Project will be executed by one EPC Contractor. The Pre-Qualification process will be carried out simultaneously for two separate Lots.
Lot 1 : Civil engineering and construction of hydraulic structures such as the dam/weir, intake and reservoir, water conveyance structures such as headrace tunnel, pressure shaft, pipe gallery, powerhouse and tailrace channel, as well as foundations for the switchyard facilities and 132‑kV and 33-kV transmission lines, access roads and operators’ permanent camp and all other civil structures of a hydro power plant including compensation measures . The scope includes also the O&M Management and training of the O&M staff of the Client.
Lot 2: Engineering, manufacture, supply, installation and commissioning of all mechanical and electrical works including three (3) high-head, multi-jet (6), vertical-axis Pelton turbines and generator sets including control systems, transformers, SCADA, switchyard and balance of plant; it also includes hydro-mechanical equipment (powerhouse and dam), steel-lined pressure shaft, steel penstock pipes and the 132‑kV and 33-kV transmission lines. The scope includes also the O&M Management and training of the O&M staff of the Client.
You must be logged in to access this page
Please click "Log in" to log in with your user details. If you do not have a GTAI user account yet, you can sign up free of charge in order to have access to all our services and information. Sign up now.