Hit: 3
  • Sep 29, 2020 Tender Notice Peru Water Collection
    store page page bookmarkeddownload

    Construction Services, Drinking Water Catchment/Drinking Water Treatment Plants

    Tender with Postqualification

    Deadline: Nov 13, 2020

    Financing: KfW Entwicklungsbank

    Project Measures:
    The objective of the “Program of Rapid Impact Measures II - PMRI II - SEDAJULIACA SA, is to contribute to achieving in the medium term the improvement of the drinking water supply in order to improve the quality of life of users and contribute to the financial situation of the EPS to achieve self-financing.
    Requested Services:
    Measure 1: Improvement of the drinking water catchment, replacing the pipes of catchment 1 and 2; installation of a pump in catchment house 2, change of the...

  • Sep 17, 2020 Tender Notice Peru Water Supply, Irrigation
    store page page bookmarkeddownload

    Consulting Services, Water Supply/Water Loss Reduction

    PQ-Result

    Financing: KfW Entwicklungsbank

    Project Measures:
    The Water Loss Reduction Program II, is designed to assist and strengthen Companies supplying Water and Sanitation Services (EPS) in their capacity to adapt to climate change, improving the management of water resources through reduction and control of water losses. The EPS of SEDALIB (Drinking Water and Wastewater Service Company of La Libertad, S.A), is an entity that provides its services in the towns of Trujillo Metropolitano, Chepén, Puerto Malabrigo, Paiján, Moche, Chocope and...

  • Aug 17, 2020 Tender Notice Peru Water Supply, Irrigation
    store page page bookmarkeddownload

    Consulting Services, Extension/Reconstruction of Water and Sanitation Infrastructure

    PQ-Result

    Financing: KfW Entwicklungsbank

    Project Measures:
    The “Rehabilitation and Climate Prevention Program in the Water Sector” aims to support two Water Supply and SanitaService Providers (EPS) in the rehabilitation of water and sanitation services in the cities of Trujillo and Chimbote, thus improving the resilience of both cities. The sanitation infrastructure in these two cities was damaged by the floods generated by the climatic phenomenon “el Niño Costero” The measures included in the Program have been divided into two types:
    -...

  • 1
go to top

Log in

Please log in on this page with your log-in details.