  • Feb 18, 2021 Tender Notice Jordan Water Collection
    store page page bookmarkeddownload

    Consulting Services, Development of a New Wellfield (Basalt) - ADDENDUM 02

    Prequalification

    Deadline: Mar 03, 2021

    Financing: KfW Entwicklungsbank

    Requested Services:
    The PEA is seeking to engage a qualified consultant to perform the following services for the development of a new wellfield (“Basalt Wellfield”), which should include as a minimum the following tasks:
    Review of available information and investigations about the presently available water resources at the existing Basalt wellfield;
    Assessment and analysis of available hydro-geological investigations concerning exploration and development of additional water resources in the wider...

  • Feb 03, 2021 Tender Notice Jordan Water Supply, Irrigation
    store page page bookmarkeddownload

    Consulting Services, Water Sector Programme

    Expression of Interest - Prequalification

    Deadline: Mar 08, 2021

    Financing: KfW Entwicklungsbank

    Project Measures
    As response to the severe impacts of the COVID-19 pandemic on the water sector in Jordan, the German Government, through KfW Development Bank, intends to support the Jordanian Government by a 2-phased Operation Support Funds in form of a grant:
    • Phase 1: COVID-19 Results-based Programme for Sustainable Operation in the Water Sector with a financing volume of around 17 million EUR, to be implemented in 2021 and 2022
    • Phase 2: Results-based Financing in the Water Sector with a...

  • Jan 25, 2021 Tender Notice Jordan Environmental Technologies
    store page page bookmarkeddownload

    Construction/Rehabilitation of Pump Stations and Water System

    PQ-Result

    Financing: KfW Entwicklungsbank

    Requested Services:
    Procurement of Works for the Improvement of the Energy Efficiency in the Water Sector
    Rehabilitation of existing five (5) Pump Stations, mechanical and electrical works including SCADA, and Reconstruction of the Primary and Secondary Water System in As Salt / Jordan:
    Installation of primary pipelines DN 200 to DN 800: approximately 14,600 m
    Installation of secondary pipelines DN 100 to DN 400: approximately 27,000 m
    Installation of tertiary pipelines DN 50 to DN 150...

  • Jan 22, 2021 Tender Notice Jordan Water Supply, Irrigation
    store page page bookmarkeddownload

    Consulting Services, Feasibility Study for Water Loss Reduction of King Abdullah Canal (KAC)

    PQ-Result

    Financing: KfW Entwicklungsbank

    Requested Services:

    The Feasibility Study (FS) and Preliminary Design for the selected alternative for “Adaptation to Climate Change through Water Loss Reduction of King Abdullah Canal (KAC)” will be executed by JVA with funding provided by KfW Development Bank. The aim is to identify and compare suitable alternatives to reduce the water losses in KAC by means of a multi-criteria analysis. The most sustainable and efficient measure will be selected and designed during the project. The FS will examine...

  • Dec 23, 2020 Tender Notice Jordan Waste Water Disposal, Drainage
    store page page bookmarkeddownload

    Rehabilitation and Upgrading of Irbid Central and Wadi Arab Wastewater Treatment Plants

    PQ-Result

    Financing: KfW Entwicklungsbank

    Short description:
    Contractors are invited to prequalify for either or both of the following contract:
    The Contract will comprise two parts as follows:
    Section 1: Reconstruction and Upgrading of the existing Irbid Central WWTP for capacity 13,000m3/d (app. 145.000 PE)
    Section 2: Reconstruction and Upgrading of the existing Wadi Al Arab WWTP for capacity 27,000 m3/d (app. 350.000 PE)

  • Dec 23, 2020 Tender Notice Jordan Waste Water Disposal, Drainage
    store page page bookmarkeddownload

    Consulting Services, Wastewater Network Karak

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract:
    Implementation of the Sewer System in Karak
    Final design and tender documents were elaborated in 2010 for the supply, construction, installation, completion, operation and maintenance of the following Works in the context of the Project “Wastewater in Karak and Kofranja”: Supply and install sewer network of diameters DN 300, DN 200 and DN 150 of approximately 41,817 m length. Construction of two wastewater pumping stations for Karak including pumps, Main...

  • Dec 23, 2020 Tender Notice Jordan Waste Water Disposal, Drainage
    store page page bookmarkeddownload

    Consulting Services, Water Supply and Wastewater Disposal Projects

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract
    The Consultant shall carry out pre-screening, feasibility studies including conceptual designs for water and wastewater projects in the North of Jordan. The Consultancy shall develop along the following steps:
    − Identification of measures in water supply/wastewater disposal with an amount of 120 million € in regions with a high density of Syrian refugees
    − Screening, prioritisation of measures on pre-set criteria approved by WAJ / KfW resulting in an investment of 60...

  • Dec 16, 2020 Tender Notice Jordan Waste Water Disposal, Drainage
    store page page bookmarkeddownload

    Consulting Services, Feasibility Study for Sewage Sludge Disposal

    PQ-Result

    Financing: KfW Entwicklungsbank

    Requested Services:
    The requested services aim to identify and elaborate concepts for the safe, environmentally sound and climate-friendly disposal of sewage sludge and faecal sludge within the frame work of a feasibility study covering approximately the following aspects, amongst others:
    Elaborate concepts for the safe final disposal of sewage sludge (originating from the wastewater treatment plants in northern Jordan) including domestic faecal sludge (septage) delivered by tankers
    Estimation of the...

  • May 18, 2020 Tender Notice Jordan Water Technologies
    store page page bookmarkeddownload

    Rehabilitation and Upgrading of Wastewater Treatment Plant

    Cancellation Notice KfW

    Financing: KfW Entwicklungsbank

    Notice is given that the bidding procedure has been cancelled by the Special Tenders Committee for the below mentioned tender (published on 14.03.2018) due to technical and procedural reasons.


    Requested works/services:
    The Contract will comprise two parts as follows:
    Part 1 - Reconstruction and Upgrading of the existing Salt WWTP for capacity 25,000m3/d. The reconstructed WWTP will comprise: Inlet Works; screening, flow measurement, grit & grease removal, primary settlement tanks.

  • Dec 03, 2019 Tender Notice Jordan
    store page page bookmarkeddownload

    Rehabilitation and Upgrading of Wastewater Treatment Plants

    Cancellation Notice KfW

    Financing: KfW Entwicklungsbank

    Ref: 27/2019/SW - BMZ201166594/KFW503392
    Project: Nexus and Resource Protection - Climate Change Mitigation Measures Phase 2
    Requested services: Rehabilitation, Upgrading and Operation of Irbid Central and Wadi Arab Wastewater Treatment Plants

  • 1