Tender Notice Burkina Faso Water Collection

Design and Construction, Drinking Water Treatment Plant

Tender Award

  • Country Burkina Faso
  • Financing KfW Entwicklungsbank
  • Reference Number BMZ201468503/BMZ201470350/BMZ201767516/KFW506526; Tender No 039/2020/ONEA/DG
  • Subject Water supply and sanitation in small and medium sized towns in the regions of Boucle du Mouhoun, Cascades, Hauts-Bassins and Sud-Ouest

Brief description of the Contract:

  • Design and construction of a 400 m3/h drinking water treatment plant including raw water intake with primary treatment, 18 km raw water gravity pipeline (ductile iron DN600 and DN350), refurbishment of the existing water treatment plant with a capacity of 200 m3/h, 2 pumping stations, 2 water towers (500 and 300 m3) and a 800 m3 ground reservoir, electricity supply, control–command for automatic operation. The Time for Completion for design and construction is 730 calendar days. Contractor’s tasks involve training of staff as well as operating of the plant for a 365 calendar day’s period.

You must be logged in to access this page

Please click "Log in" to log in with your user details. If you do not have a GTAI user account yet, you can sign up free of charge in order to have access to all our services and information. Sign up now.

Log in

Please log in on this page with your log-in details.