Tender Notice Morocco Below-Ground Construction, Infrastructure
Hydro-Agricultural Development Works for the Sidi Mohamed Cherif Irrigation Scheme
Jul 31, 2025
- Country Morocco
- Deadline Sep 18, 2025
- Financing KfW Entwicklungsbank
- Reference Number BMZ201665140/KfW511974; N° 32/2025/DPA/SAHA
- Subject Project for Improving Water Use Efficiency in Irrigated Agriculture (Sidi Mohamed Cherif Scheme)
Requested Services:
Construction and the supply and installation of equipment for the headworks of the Sidi Mohamed Cherif irrigation scheme associated with the Oualjet Essoltane Dam. These headworks include:
- An intake structure on the Beht River in the form of a diversion weir across the entire minor bed of the river;
- A box culvert starting at the outlet of the intake structure and discharging into a suction sump for the pumping station, over a length of 120 m;
- A pumping station with its equipment, civil works, and ancillary buildings, which will pump water from the suction sump to a regulating reservoir located at an elevation of 250 m above mean sea level (MSL);
- A DN 1500 mm discharge pipeline from the pumping station to the regulating reservoir, approximately 1,730 m in length;
- A regulating reservoir located at an elevation of 250 m (MSL) supplying the entire irrigation scheme;
- A photovoltaic solar power plant connected to the 22 kV medium-voltage grid with a minimum capacity of 1.5 MW;
- The electrical connections between the various structures and equipment, including connection to the ONEE power grid.