Construction, Rehabilitation Overhead Transmission Line
Deadline: Jun 12, 2025
Financing: KfW Entwicklungsbank
Requested Services:
Rehabilitation of 400 kV OHL Mukacheve (UA) – Velke Kapusany (SK)
Your company is already operating in Germany and you would now like to export worldwide?
Deadline: Jun 12, 2025
Financing: KfW Entwicklungsbank
Requested Services:
Rehabilitation of 400 kV OHL Mukacheve (UA) – Velke Kapusany (SK)
Tender Award
Financing: KfW Entwicklungsbank
Brief Description of the Contract:
The project includes protection and restoration of the Zhoujiaba Ecological Wetland, the construction of ecological dike, construction of the ecological wetland for advanced wastewater treatment and basic instruments for monitoring and operation of the wetland park, the construction of Zhoujiaba Gate 2, and the supply and installation of all the equipment and facilities as well as conducting the commissioning.
Deadline: Jun 03, 2025
Financing: KfW Entwicklungsbank
Project:
The United Water Supply Company of Georgia LLC (UWSCG) has received from KfW toward the cost of the Communal Infrastructure for Environment and Tourism Improvement – Imereti Region and intends to apply part of the proceeds toward payments under the contract for IM-2/Y1-WWTP_LSC - Vani, Baghdati, and Sairme.
Requested Services
The United Water Supply Company of Georgia LLC (UWSCG) now invites sealed Bids from Bidders for the design, supply and installation of the following works (N.B.
Correction/ Prequalification
Deadline: Jun 26, 2025
Financing: KfW Entwicklungsbank
Requested Services:
Finance, design, construct, own, operate, maintain and transfer four (4) Lots of Mini-grids with a total installed capacity of up to 3 MW in the Nampula province; each Lot will include various Mini-grids each with a planned installed capacity of between 25 kWp and 100 kWp and BESS
Deadline Extension/ Addendum
Deadline: May 07, 2025
Financing: KfW Entwicklungsbank
Requested Services:
Supply, Operation and Maintenance of 500 (nos.) of 12 metre – Low Floor – Electric Buses and Charging Solution along with Depot Improvement works for Chennai, Coimbatore and Madurai in Tamil Nadu
Tender Award
Financing: KfW Entwicklungsbank
Project
The King Abdullah Canal (KAC) is the largest irrigation canal in Jordan running parallel to the east bank of the Jordan River from north to south throughout the Jordan Valley (JV). The KAC is an artificial water conveyor serving as a water source for drinking water supply of Amman and Irbid as well as for irrigation throughout all parts of the Jordan Valley.
KAC was constructed between 1959 and 1987. After intensive operation, the canal faces severe water loss problems. Recently, a...
Deadline Extension
Financing: KfW Entwicklungsbank
Requested Services:
The purpose of this tender is to register the price for future and possible provision of services for the implementation of Simplified Water Supply Systems – SSAA in rural areas located in several municipalities in Ceará with the supply of materials, equipment and services duly specified in Annex I.10 – List of Municipalities Included in the Águas do Sertão Program.
Universal access to drinking water in Ceará will positively impact health and quality of life in rural areas...
Deadline Extension/ Addendum/ Prequalification
Deadline: May 19, 2025
Financing: KfW Entwicklungsbank
Requested Services:
Upgrade & Rehabilitation (DBO) for South Amman Wastewater Treatment Plant at South Amman . The Contractor shall operate and maintain the WWTP for a period of 15 years
Deadline Extension
Deadline: May 21, 2025
Financing: KfW Entwicklungsbank
Requested Services:
Design, Manufacture, Supply, Installation, Testing and Commissioning Of Signalling and Train Control System and Telecommunication Systems For Bengaluru Suburban Rail Project
Deadline: Jun 18, 2025
Financing: Banco Centroamericano de Integracion Economica (BCIE)
Requested Services:
Improvements to the Integrated Aqueduct of Buenos Aires, Puntarenas: Bottom intake and sand trap with a treatment capacity of 120 L/s, Intake line from the sand trap to the water treatment plant, approximately 2.6 km long, Water treatment plant with an installed processing capacity of 120 L/s, with the possibility of expansion, and a 5 L/s pumping station, Water discharge pipeline from the pumping station to the Santa María elevated tank, approximately 1.95 km long, Water delivery...