Hit: 310
  • Sep 16, 2021 Tender Notice Tunesia Surveying, Geology
    store page page bookmarkeddownload

    Geological and Geotechnical Surveys

    Tender with Postqualification

    Deadline: Nov 03, 2021

    Financing: KfW Entwicklungsbank

    Requested Services:
    conduction of geological and geotechnical surveys at the pumped storage power plant Zagua



    The original document in French language is available for download!

  • Sep 16, 2021 Tender Notice Senegal Economic Promotion, Foreign Trade Promotion
    store page page bookmarkeddownload

    Consulting, SME Investment Fund

    Prequalification/ Deadline Extension

    Deadline: Sep 22, 2021

    Financing: KfW Entwicklungsbank

    Project:
    Setting up and operationalization of a single-country investment vehicle targeting Senegalese SMEs


    Services required:
    (a) Review of the structuring
    (b) Implementation
    (c) Fundraising
    (d) Investment management
    (e) Risk and compliance management
    (f) Operational fund management
    (g) Portfolio management
    (h) Technical Assistance Facility management
    Further details are available in the original document in French language (see Download)!

  • Sep 16, 2021 Tender Notice China Vocational Education
    store page page bookmarkeddownload

    Equipment for Vocational Training Institution (Anhua County Vocational Junior College)

    Deadline Extension

    Deadline: Oct 09, 2021

    Financing: KfW Entwicklungsbank

    Requested Services:
    supply of teaching equipment/campus network & supporting equipment and training equipment and general equipment for Anhua County Vocational Junior College

  • Sep 15, 2021 Tender Notice Mozambique Smart Grids
    store page page bookmarkeddownload

    Consulting Services, OPGW Retrofit on High Voltage Transmission Lines Project

    PQ-Result

    Financing: KfW Entwicklungsbank

    Project:
    The main objective is to build-on EDM’s integrated telecommunications and SCADA network with sufficient coverage, capacity or resilience to meet some of the most fundamental requirements of its core electricity supply operations and its enterprise management applications.
    Existing Overhead transmission lines shall gradually be fitted with an OPGW. The Retrofit of the transmission lines mentioned below are part of the telecommunication backbone but for which no further investment has been...

  • Sep 15, 2021 Tender Notice Albania Recycling & Waste Management
    store page page bookmarkeddownload

    Equipment for Collection and Transport of Municipal Waste and of Street Sweeping Equipment

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract:
    Lot 1 – Regional waste collection
    The supplies comprises more than 15 waste compaction collection vehicles, dump trucks and other mobile equipment, as well more than 1500 waste bins for Vlora and Selenica Municipalities. Included:
    20 m³ to 6 m³ compaction trucks
    1,5 m³ bins, metal with plastic lid
    Dump truck
    Backhoe Loader
    Lot 2 - Separate waste (Pilot Projects) – Vlora City
    In order to promote the waste separation at source and the establishment of recycling...

  • Sep 15, 2021 Tender Notice North Macedonia Heating
    store page page bookmarkeddownload

    Construction, District Heating System Bitola

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract:
    Contract 1
    Briefly, the main works to be constructed under a FIDIC Yellow Book contract are:
    Transmission pipeline 2 × DN500 with a length of approximately 12,6 km
    Distribution network incl. all associated branch pipes (Pipe diameters reaching from DN700 to DN50) to the heating consumers in the city of Bitola (approx. network length 16 km)

  • Sep 14, 2021 Tender Notice Albania Water Supply, Irrigation
    store page page bookmarkeddownload

    Consulting Services, Water Sector Programme

    PQ-Result

    Financing: KfW Entwicklungsbank

    Programme:
    Based on the National Albanian Master Plan for Water Supply and Sewerage, the Government of Albania (GoA) and KfW have identified priority investments in 7 of the 15 largest water utilities of Albania, namely in Berat and Kuçova (one joint utility), Elbasan, Fier, Kamza, Lezha, Shkodra and Vlora. In addition, the level of performance and institutional capacity was assessed for each location.
    Based on these findings, Feasibility Studies (FS), Environmental and Social Impact Assessments...

  • Sep 13, 2021 Tender Notice Mongolia Mobility
    store page page bookmarkeddownload

    Off-road Vehicles

    Re-Tender

    Deadline: Oct 28, 2021

    Financing: KfW Entwicklungsbank

    Requested Services:
    Supply of 18 off-road vehicles to the western cluster area of Mongolia’s Environmental Organizations

  • Sep 13, 2021 Tender Notice Bosnia and Herzegovina Waste Water Disposal, Drainage
    store page page bookmarkeddownload

    Design and Construction Works, Wastewater Treatment Plant Zenica

    Prequalification

    Deadline: Oct 15, 2021

    Financing: KfW Entwicklungsbank

    Project:
    The project “Wastewater Collection and Treatment Zenica” is located in Bosnia and Herzegovina, in the City of Zenica and comprises the construction of new collectors, pumping stations and a wastewater treatment plant. The project aims for ensuring improvement of sewage disposal at socially acceptable costs


    Requested Services:
    Design and Build Works for Zenica Wastewater Treatment Plant. Qualified Contractors or Joint Ventures are invited to submit a Prequalification Document for the...

  • Sep 13, 2021 Tender Notice Tajikistan Hydroelectricity
    store page page bookmarkeddownload

    Electromechanical Equipment for Hydropower Project

    Deadline Extension/ Prequalification

    Deadline: Oct 06, 2021

    Financing: KfW Entwicklungsbank

    Project:
    Pamir Energy plans to build the 11 MW Sebzor HPP run-of-river small hydropower scheme on the Shokhdara River in Roshtqala districts of VMKB in Tajikistan. The project is located about 20 kilometres south–east from the regional centre of Khorog. The hydropower project consists of a 3.1 km long buried steel penstock, feeding into a powerhouse with three vertical Pelton generating units with an installed capacity of about 3 x 3.7 MW and a 110kV / 35 kV switchyard. The plant net head is about 115...

go to top

Log in

Please log in on this page with your log-in details.