Your company is already operating in Germany and you would now like to export worldwide?

Search

Europe (282)
reset all filters

Search results

Hit: 282
  • Apr 15, 2024 Tender Notice North Macedonia Hydroelectricity
    store page page bookmarkeddownload

    Construction/Supply, Hydromechanical Equipment (Hydropower) (Lot 6)

    Prequalification

    Deadline: May 23, 2024

    Financing: KfW Entwicklungsbank

    Brief Description of the Project:

    The Project is the third rehabilitation phase of the Six Hydro Power Plants Programme and comprises several mechanical, electrical and construction measures for the rehabilitation of six large Hydropower Plants (HPP) in the Republic of North Macedonia, owned by ESM (HPP Vrutok, HPP Vrben; HPP Raven; HPP Tikves; HPP Spilje; HPP Globochica), as well as on two dams (Mavrovo and Globocica) and other associated structures.

    Requested Services:

    Plant and Design-Build...

  • Apr 15, 2024 Tender Notice North Macedonia Hydroelectricity
    store page page bookmarkeddownload

    Construction/Supply, Flow Measurement and Dam Monitoring System (Lot 5)

    Prequalification

    Deadline: May 21, 2024

    Financing: KfW Entwicklungsbank

    Brief Description of the Project:

    The Project is the third rehabilitation phase of the Six Hydro Power Plants Programme and comprises several mechanical, electrical and construction measures for the rehabilitation of six large Hydropower Plants (HPP) in the Republic of North Macedonia, owned by ESM (HPP Vrutok, HPP Vrben; HPP Raven; HPP Tikves; HPP Spilje; HPP Globochica), as well as on two dams (Mavrovo and Globocica) and other associated structures.

    Requested Services:

    Plant and Design-Build...

  • Apr 15, 2024 Tender Notice North Macedonia Hydroelectricity
    store page page bookmarkeddownload

    Construction/Supply, Transmission Line (Hydropower) (Lot 4)

    Prequalification

    Deadline: May 27, 2024

    Financing: KfW Entwicklungsbank

    Brief Description of the Project:

    The Project is the third rehabilitation phase of the Six Hydro Power Plants Programme and comprises several mechanical, electrical and construction measures for the rehabilitation of six large Hydropower Plants (HPP) in the Republic of North Macedonia, owned by ESM (HPP Vrutok, HPP Vrben; HPP Raven; HPP Tikves; HPP Spilje; HPP Globochica), as well as on two dams (Mavrovo and Globochica) and other associated structures.

    Requested Services:

    Plant and Design-Build...

  • Apr 15, 2024 Tender Notice Albania Electric Mobility
    store page page bookmarkeddownload

    Consulting Services, Implementation Consultant for the Project Green Transport Tirana

    PQ-Result

    Financing: KfW Entwicklungsbank

    Brief Description of Contract:
    Qualified independent consultants are invited to submit prequalification documents for consulting services for the implementation of the a.m. project. The project aims at developing, designing, implementing and operating/maintaining the first electric bus rapid transport system (“e-BRT”) in Tirana. The Project consist of the following components:
    Component 1: e-buses and on route fast-charging infrastructure, e.g. opportunity chargers (“OCC”)
    Component 2: Civil works...

  • Apr 11, 2024 Germany Research and Development
    store page page bookmarked

    European Commission Embraces R&D Strategy Plan

    The European Commission has adopted the second strategic plan for the “Horizon Europe” research and innovation program.

  • Apr 10, 2024 Germany Energy Storage & Fuel Cell Industry
    store page page bookmarked

    Wittenberg to be Home to Storage Battery Gigafactory

    TESVOLT is undertaking a EUR 30 million expansion in the eastern German city, best known for its role in the Reformation. Could a similar sea change be coming in energy storage?

  • Apr 09, 2024 Germany Production Equipment for Chemicals, Petrochemicals and Pharmaceuticals
    store page page bookmarked

    Eli Lilly and Co. Starts Work on Huge New Factory

    US pharmaceutical giant Eli Lilly and Company has broken ground on a massive production facility in western Germany.

  • Apr 08, 2024 Tender Notice Armenia Smart Grids
    store page page bookmarkeddownload

    HVDC Converter Station

    Cancellation Notice KfW

    Financing: KfW Entwicklungsbank

    CANCELLATION OF TENDER
    The tender for Lot 3, HVDC Converter Station at Ayrum was cancelled according to KfW Procurement Guidelines (January 2019) Art. 2.5.15 item (1) when there has been a lack of competition (Prequalified bidders have not submitted their technical and financial bids).

    Requested Services:
    Lot 3: design and construction of Ayrum HVDC Converter Station in Armenia on a turnkey basis. The scope of work shall include design, manufacturing, delivery, installation, commissioning and...

  • Apr 03, 2024 Germany Business Location Germany
    store page page bookmarked

    Inflation Returns to Normal in Germany

    After three years of dramatic price increases, inflation is back at regular levels in Europe’s largest economy.

  • Mar 22, 2024 Tender Notice Montenegro Water Supply, Irrigation
    store page page bookmarkeddownload

    Construction Services, Water Supply and Sanitation on the Adriatic and Montenegrin Coast

    Cancellation Notice KfW

    Financing: KfW Entwicklungsbank

    CANCELLATION OF TENDER NOTICE!

    Requested Services
    Construction of water supply transmission and distribution systems including house connections; sewerage networks with manholes, house connections, pumping stations including sea outfalls all in Tivat.

Log in

Please log in on this page with your log-in details.