Your company is already operating in Germany and you would now like to export worldwide?

Search

Tenders (233) Calls for Bids and Procurement (108) Water Supply, Irrigation (142) Calls for Bids (26)
reset all filters

Search results

Hit: 233
  • May 14, 2024 Tender Notice Indonesia Environmental Technologies
    store page page bookmarkeddownload

    Consulting Services, Capacity Building to Support Operational Sustainability of Regional Water Supply System Wosusokas

    Tender Award

    Financing: KfW Entwicklungsbank

    Project Objective
    The objective of this Capacity Building project is to provide PT. Tirta Utama Jawa Tengah.TUJT and each of 4 PDAMs with the capabilities to train independently additional staff for the sustainable operation of the Wosusokas system after the completion of this Capacity Building project. With these capabilities, a solid framework for the sustainable operation of all sections of the companies shall be secured.

    Brief description of the Contract:
    The expected outputs of this...

  • May 13, 2024 Tender Notice Benin Plant Production
    store page page bookmarkeddownload

    Construction of Rice Fields and Four Agricultural Areas (Ikouari and Koupokouo)

    Deadline: Jun 27, 2024

    Financing: KfW Entwicklungsbank

    Requested services:
    Development of 90,68 ha of rice fields and two agricultural areas in the lowlands of Ikouari and Koupokouo, three lots

  • May 12, 2024 Tender Notice Tunesia Environmental Technologies
    store page page bookmarkeddownload

    Dam Construction

    Deadline: Jun 25, 2024

    Financing: KfW Entwicklungsbank

    Requested services:
    Construction of the Raghai dam and related structures, including intake tower, temporary diversion tunnel, valve chamber, spillway, etc.

  • May 10, 2024 Tender Notice Indonesia Geothermic Energy
    store page page bookmarkeddownload

    Consulting Services, Implementation Consultant for Rehabilitation of Geothermal Power Plant

    Prequalification/ Deadline Extension

    Deadline: May 31, 2024

    Financing: KfW Entwicklungsbank

    Project:
    As part of German Financial Cooperation (FC) with the Republic of Indonesia, the German Government and the Government of the Republic of Indonesia have agreed to increase and to ensure reliable power supply based on Renewable Energies in the power sector of Indonesia. To this end, the Units 2 & 3 (2 x 55 MW) of Kamojang Geothermal Power Plant (KGPP) shall be rehabilitated. The objective of the project is to increase the reliability, the efficiency as well as to achieve an output optimization...

  • May 09, 2024 Tender Notice Uzbekistan Environmental Technologies
    store page page bookmarkeddownload

    Consulting Services, Feasibility Studies for Urban Water Supply and Sanitation

    Tender Award

    Financing: KfW Entwicklungsbank

    Brief description of the Contract:
    The consultancy services shall be performed tentatively for the following tasks:
    Update of pre-feasibility study long list and preparation of three further towns on pre-feasibility study level
    Analysis of potential co-financing with other IFIs in other regions
    Bankable Technical and Institutional Feasibility Study for Water and Sanitation for the three cities and adjacent communities of Termez, Kokand and Margi`lon
    Sub sections/reports for each region (Surkhandarya...

  • May 09, 2024 Tender Notice Costa Rica Water Technologies
    store page page bookmarkeddownload

    Commercial and Operational Engineering Services for Drinking Water Loss Reduction

    Deadline: Jun 05, 2024

    Financing: KfW Entwicklungsbank/ Banco Centroamericano de Integracion Economica (BCIE)

    Requested services:

    Procure on demand engineering services such as: mathematical modelling and design of hydraulic sectors, commercial works such as mass meter installation and fraud detection. Also the implementation of operational activities such as the installation of hydraulic accessories or instrumentation and the location and repair of leaks.

  • May 09, 2024 Tender Notice Morocco Water Supply, Irrigation
    store page page bookmarkeddownload

    Natural Catalytic Material for Water Treatment Plan

    Deadline Extension/ Addendum

    Deadline: May 23, 2024

    Financing: KfW Entwicklungsbank

    Requested services:
    Supply and implementation of a pyrolusite-type natural catalytic material for demanganisation treatment at the Bouregreg water treatment plant

  • May 07, 2024 Tender Notice Tunesia Waste Water Disposal, Drainage
    store page page bookmarkeddownload

    Consulting, Rehabilitation of a Waste Water Treatment Plant

    PQ-Result

    Financing: KfW Entwicklungsbank

    Requested services:
    Preparation of the detailed preliminary design, the environmental and social impact study, the tender documents, and assistance in the supervision of the construction of the wastewater treatment plant in Choutrana

  • May 06, 2024 Tender Notice Peru Recycling & Waste Management
    store page page bookmarkeddownload

    Implementation consultant for Solid Waste Management Program

    Prequalification

    Deadline: Jun 07, 2024

    Financing: KfW Entwicklungsbank

    Requested services:
    Consulting services to support in 1) Verify feasibility studies, 2) Preparation of detailed design and technical file of infrastructures, 3) Review environmental and social impact studies, 4) Preparation of bidding documents and support during the bidding procedures, and 5) works supervision.

  • May 06, 2024 Tender Notice Ghana Photovoltaics
    store page page bookmarkeddownload

    Implementation Consultant for Floating Solar Project

    Expression of Interest - Prequalification

    Deadline: Jun 07, 2024

    Financing: KfW Entwicklungsbank

    Requested services:
    The Floating Solar Project concerns the installation of a utility-scale floating solar photovoltaic power plant (FPV) at the Kpong Reservoir (Akuse) with an estimated total generation capacity of 30 MWp in the first phase. Through the involvement and financing of private investors, the plant is to be expanded to around 50 MWp in a second phase. German bilateral Financial Cooperation funds are earmarked for the first phase of this Project, which is being implemented by the German...

Log in

Please log in on this page with your log-in details.