Your company is already operating in Germany and you would now like to export worldwide?

Search

Tenders (213) Below-Ground Construction, Infrastructure (96) Social Responsibility (111) Environmental Friendliness (133) Road Transport (25)
reset all filters

Search results

Hit: 213
  • May 20, 2024 Tender Notice Bolivia Water Supply, Irrigation
    store page page bookmarkeddownload

    Consulting Services, Drinking Water Supply and System Improvement

    PQ-Result

    Financing: KfW Entwicklungsbank

    Project:
    The Program contemplates the construction of a drinking water treatment plant and main conduction pipes for the city of Sucre, as well as the construction of a water delivery and delivery system.
    In this way, it is intended to contribute to the improvement of health, environmental and living conditions of the population in the coverage area.
    In this context, the Consultant who is awarded this tender will support the EE as a Preparation and Implementation Consultant.
    Requested...

  • May 18, 2024 Tender Notice India Photovoltaics
    store page page bookmarkeddownload

    Consulting, Construction and Supply for 50 MW Solar-PV Power Project

    Deadline Extension/ Addendum

    Deadline: May 28, 2024

    Financing: KfW Entwicklungsbank

    Requested service:
    design, engineering, manufacture, supply, erection, testing and commissioning of 2 x 25 MWAC crystalline grid interactive solar PV power project (with dry cleaning) along with associated power evacuation infrastructure arrangement including 5 years operation & maintenance at villages Malkhed und Mangladevi (district Yavatmal, state Maharashtra)

  • May 18, 2024 Tender Notice India Photovoltaics
    store page page bookmarkeddownload

    Consulting, Construction and Supply for 40 MW Solar-PV Power Project

    Deadline Extension/ Addendum

    Deadline: May 28, 2024

    Financing: KfW Entwicklungsbank

    Requested service:
    design, engineering, manufacture, supply, erection, testing and commissioning of 2 x 20 MWAC crystalline grid interactive solar PV power project (with dry cleaning) along with associated power evacuation infrastructure arrangement including 5 years operation & maintenance at villages Babhulgaon and Saykheda, district Washim, state Maharashtra

  • May 17, 2024 Tender Notice India Public Transportation
    store page page bookmarkeddownload

    Consulting Services for the Surat Metro Rail Project - Accompanying Measure

    Deadline Extension/ Prequalification

    Deadline: Jun 03, 2024

    Financing: KfW Entwicklungsbank

    Requested Services:
    Consulting Services under the Accompanying Measure for the Surat Metro Rail Project, Phase - I.

  • May 17, 2024 Tender Notice India Below-Ground Construction, Infrastructure
    store page page bookmarkeddownload

    Construction Services, Integration of Metro Stations in Corridor 1

    Prequalification/ Deadline Extension

    Deadline: May 30, 2024

    Financing: KfW Entwicklungsbank/ Agence Française de Développement (AFD)

    Requested Services:
    Construction of multi modal integration works for 16 metro stations in corridor 1 - priority reach (10 stations), and underground (6 stations) namely Dream City, Convention Center, Bhimrad, Women ITI, VIP Road, Althan Gam, Althan Tenement, Rupali Canal, Majura Gate, Kadarsha Ni Nal, Chowk Bazaar, Maskati Hospital, Surat Railway Station, Central Warehouse, Labheswar Chowk, and Kapodra under Surat Metro Rail Project Phase – 1

  • May 13, 2024 Tender Notice Africa, overall Financing
    store page page bookmarkeddownload

    Impact Measurement for Verdant Capital Hybrid Fund

    Prequalification

    Deadline: Jun 15, 2024

    Financing: KfW Entwicklungsbank

    Requested services:
    The main objective is to conduct an impact measurement survey for 3-5 investees of VCHF. The impact studies’ overall expected outcome is to give a clear picture of whether the Fund’s overall impact indicators have been achieved. The primary impact objective of the Fund is jobs and livelihoods creation. Secondary impact objectives are broadly based on other UN Sustainable Development Goals. The consultant(s) will engage the beneficiaries and provide a detailed report based on the...

  • May 13, 2024 Tender Notice Jordan Architecture, Engineering Services
    store page page bookmarkeddownload

    Implementation Consultant for Project Implementation Support, Construction Supervision and Supervision of Operation (Waste Water Treatment)

    Expression of Interest - Prequalification

    Deadline: Jun 13, 2024

    Financing: KfW Entwicklungsbank

    Project:
    Recently, two Feasibility Studies investigated the “biogas potential” of the existing Wastewater Treatment Plants (WWTP) across Jordan which mainly apply the extended aeration process. The studies recommended to upgrade the treatment processes of WWTPs South Amman and West Jerash to anaerobic sludge digestion and electricity generation by biogas. WAJ in this tender process is seeking to engage a qualified consultant to perform consulting services to support the implementation of the necessary...

  • May 13, 2024 Tender Notice Benin Plant Production
    store page page bookmarkeddownload

    Construction of Rice Fields and Four Agricultural Areas (Ikouari and Koupokouo)

    Deadline: Jun 27, 2024

    Financing: KfW Entwicklungsbank

    Requested services:
    Development of 90,68 ha of rice fields and two agricultural areas in the lowlands of Ikouari and Koupokouo, three lots

  • May 10, 2024 Tender Notice Indonesia Geothermic Energy
    store page page bookmarkeddownload

    Consulting Services, Implementation Consultant for Rehabilitation of Geothermal Power Plant

    Prequalification/ Deadline Extension

    Deadline: May 31, 2024

    Financing: KfW Entwicklungsbank

    Project:
    As part of German Financial Cooperation (FC) with the Republic of Indonesia, the German Government and the Government of the Republic of Indonesia have agreed to increase and to ensure reliable power supply based on Renewable Energies in the power sector of Indonesia. To this end, the Units 2 & 3 (2 x 55 MW) of Kamojang Geothermal Power Plant (KGPP) shall be rehabilitated. The objective of the project is to increase the reliability, the efficiency as well as to achieve an output optimization...

  • May 10, 2024 Tender Notice Nicaragua Waste Water Disposal, Drainage
    store page page bookmarkeddownload

    Construction of Wastewater Interceptors/Collectors

    Cancellation Notice KfW

    Financing: KfW Entwicklungsbank/ Banco Centroamericano de Integracion Economica (BCIE)

    CANCELLATION OF TENDER

    Requested services
    Expansion of the Sanitary Sewerage Network of the city of Managua
    Lot 1: Construction of Wastewater Interceptor 3 of the City of Managua
    Lot 2: Construction of the Wastewater Collectors: West Section of the Y Collector, Large Sheet and ZZZ Collector of the City of Managua

Log in

Please log in on this page with your log-in details.