Dresden Gets Cutting-Edge Microchip Test Center
American company Applied Materials and Dresden’s Fraunhofer Institute for Photonic Microsystems (IPMS) are constructing a new technology center for semiconductor metrology and process analyses.
Your company is already operating in Germany and you would now like to export worldwide?
American company Applied Materials and Dresden’s Fraunhofer Institute for Photonic Microsystems (IPMS) are constructing a new technology center for semiconductor metrology and process analyses.
53 meters long, eleven meters wide and nine meters tall...those are the dimensions of the largest ever house constructed by additive manufacturing in Europe.
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
Segment 4: construction of main water pipelines and a reservoir to improve potable water supply in the 4 districts Wonogiri, Sukoharjo, Solo and Karanganyar (Wosusokas)
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
Segment 3: construction of main water pipelines and a reservoir to improve potable water supply in the 4 districts Wonogiri, Sukoharjo, Solo and Karanganyar (Wosusokas)
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
Segment 2: construction of main water pipelines and a reservoir to improve potable water supply in the 4 districts Wonogiri, Sukoharjo, Solo and Karanganyar (Wosusokas)
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
Segment 1: construction of main water pipelines and a reservoir to improve potable water supply in the 4 districts Wonogiri, Sukoharjo, Solo and Karanganyar (Wosusokas)
Cancellation Notice KfW
Financing: KfW Entwicklungsbank
CANCELLATION OF TENDER
due to the fact that there was no qualified Bid. The tender will be re-launched!
Procurement of Design, Supply and Installation of Primary and Secondary Equipment for selected Substations
The project has two components:
Primary equipment: Refurbishment of Outdoor Primary Equipment at thirty two (32) substations
Secondary equipment: Provision of new HMI and SCADA interface at four (4) substations
The US chipmaking giant says it’s prepared to invest an additional EUR 13 billion euros in its flagship German site.
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
Collection of geological and geotechnical data on the Pumped Storage Power Station in Tabarka, including sounding.
The works mainly include:
Core drilling with in situ testing and sampling for laboratory tests;
Laboratory tests
Pressiometer soundings (MASW and TDEM seismic)
Preparation of geophysical profiles
Reconnaissance wells
Germany is Europe’s number one market for industrial and consumer 3D printing - also known as additive manufacturing.