Wirtschaftsumfeld | Ukraine | Krieg in der Ukraine
Ukraine - Bedarfsliste für Energiegüter und Winternothilfe
Dies ist eine Bedarfsliste, die von den ukrainischen Behörden ermittelt und an die EU-Generaldirektion Europäischer Katastrophenschutz und humanitäre Hilfe übermittelt wurde.
23.11.2022
Von Edda Wolf | Bonn
Energy Equipment
The top priority for replenishment is the autotransformers fleet. As of today, the need, including the replenishment of the emergency stock is the following:
- AT 750 kV - eleven phases;
 - AT 330 kV - sixteen units;
 - AT 220 kV - six units.
 
The amount of other damaged primary equipment high voltage circuit breakers, disconnectors, surge arresters, measurement transformers, and shunt reactors is tremendous as well.
Just a few figures for a clearer picture:
- current transformers 750 kV - 21 phases;
 - circuit breakers 330 kV – 15 units in 3-phase set;
 - circuit breakers 110 kV - 25 units in 3-phase set;
 - disconnectors 110 kV with one earthing switch - 33 units in 3-phase set;
 - voltage transformers 220 kV - 15 phases, etc.
 
Another priority is the relay protection and automation devices. The current demand constitutes at least of:
- 13 sets of distance and overcurrent protection;
 - 20 sets of circuit breaker control automatics;
 - 6 sets of differential busbar protection;
 - 10 sets of command transmission equipment.
 
As for thermal power plants, the needs are also substantial. In particular:
- circuit breakers 110 kV - 6 units in 3-phase set;
 - circuit breakers 330 kV – 3 units in 3-phase set;
 - disconnectors 110 kV with one earthing switch - 9 units in 3-phase set;
 - current transformers 110 kV - 6 phases;
 - voltage transformers 110 kV - 3 phases, etc.
 
The hydropower system is at risk as well and JSC Ukrhydroenergo needs the replenishment of its emergency stock of autotransformers 330 kV 7 units) and power transformers 330 kV 4 units) and 110 kV 7 units).
Civil Protection Needs
Please see below the priority civil protection needs, which were compiled by the State Emergency Service of Ukraine:
- modular houses - 6500 units for 20 people with an internal lighting system);
 - residential modules - 820 units;
 - sanitary modules - 164 units;
 - bedroom sets - 130,000 units;
 - electric generators – 6,828 units with the capacity >10 kW - 6500 units, >100 kW – 164 units, >400 kW – 164 units);
 - heat guns of indirect heating on liquid fuel or on electricity, with a thermostat and air distribution sleeves - 13,000 units;
 - mobile drinking water purification stations - 164 units. at least 1.5 cubic meters per hour);
 - tank trucks for the delivery of drinking water - 164 pcs. at least 8 cubic meters).